What is Developing? Open the mapMap

Cleared for impact studyMining · Nagaur, Rajasthan

This is a Fresh proposal for "Masonry Stone, Gravel & Murrum (Minor Mineral) mining project" [Ref. No. 202410000115304] over an Area of 1.9994 Hectare with Proposed Production Capacity– 341885 TPA (ROM) {Masonry Stone-2,50,000 TPA, Murrum & Gravel-68,264 TPA, Top Soil-10,462 TPA & Waste-13,159 TPA } & Proposed Crusher Plant with Capacity-500 TPD by Shri Bhagwana Ram S/o Shri Kalu Ram

This is a Fresh proposal for "Masonry Stone, Gravel & Murrum (Minor Mineral) mining project" [Ref. No. 202410000115304] over an Area of 1.9994 Hectare with Proposed Production Capacity– 341885 TPA (ROM) {Masonry Stone-2,50,000 TPA, Murrum & Gravel-68,264 TPA, Top Soil-10,462 TPA & Waste-13,159 TPA } & Proposed Crusher Plant with Capacity-500 TPD by Shri Bhagwana Ram S/o Shri Kalu Ram is a proposed mining project in Lodshar, Ladnu, Nagaur, Rajasthan. The site covers 4.9 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Mar 2025).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleThis is a Fresh proposal for "Masonry Stone, Gravel & Murrum (Minor Mineral) mining project" [Ref. No. 202410000115304] over an Area of 1.9994 Hectare with Proposed Production Capacity– 341885 TPA (ROM) {Masonry Stone-2,50,000 TPA, Murrum & Gravel-68,264 TPA, Top Soil-10,462 TPA & Waste-13,159 TPA } & Proposed Crusher Plant with Capacity-500 TPD, located at Near Village–Lodsar, Tehsil- Ladnun, District- Didwana-Kuchaman (Old District- Nagaur) (Rajasthan) by Shri Bhagwana Ram S/o Shri Kalu Ram.
StatusCleared for impact study
Status since8 Mar 2025
Application filed27 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantBhagwana Ram
Land area4.9 acres (2 ha)
Project cost₹1.5 crore
Village / localityLodshar
Taluk / tehsilLadnu
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-28775

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jul 2026More information requested4.9 acres₹1.5 crore
Early planning filed 27 Feb 2025 (this page)Cleared for impact study4.9 acres₹1.5 crore

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 71% of them.

17 other mining leases have applied within 500 m of this site; together with this one they cover 46.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 68 mining leases have applied within 5 km.

Where it is

Lodshar, Ladnu, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bhagwana Ram in Nagaur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.