Quick answers
What is this project?
Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi, Tehsil: Kolayat and District: Bikaner (Rajasthan), Mining Lease Area: 118.99 Hectare Total Production capacity: 75000 TPA in Favor of M/s Sampat Lal Daga is a lapsed mining project in Gajner, Kolayat, Bikaner, Rajasthan. The site covers 294 acres.
Who is building it?
The applicant is M/S Sampat Lal Daga.
Has it been approved?
No. The application was lapsed on 31 Mar 2026, so it is no longer under consideration.
Where is it?
In Gajner, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹40 lakh and a site of 294 acres.
When was it filed?
The application was filed on 11 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi, Tehsil:…
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Mar 2026 |
| Application filed | 11 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Sampat Lal Daga |
| Land area | 294 acres (119 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Gajner |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-29114 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Apr 2026 | Lapsed | 294.1 acres | ₹3 crore |
| Early planning filed 11 Jul 2025 (this page) | Lapsed | 294 acres | ₹40 lakh |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 294 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 54 have applied within 5 km.
Where it is
Gajner, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi,… — lapsed, 0 m away
- Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi,… — lapsed, 0 m away
- Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi,… — cleared for impact study, 0 m away
- Proposed Project of Ball Clay, Silica Sand, Gravel & Murrum, Mining Project… — lapsed, 700 m away
- This is a fresh proposal of "Ball Clay, Silica Sand" (Minor Mineral) Mining… — cleared for impact study, 900 m away
- "Ball Clay & Silica Sand, Mining Project, Delineated Plot No. 57/2023" having… — cleared for impact study, 1 km away
- This is a fresh proposal of "Ball Clay, Silica Sand" (Minor Mineral) Mining… — cleared for impact study, 1 km away
- This is a fresh proposal of "Ball Clay, Silica Sand" (Minor Mineral) Mining… — withdrawn, 1 km away
More from M/S Sampat Lal Daga in Bikaner
- Area Amendment in Environmental Clearance for Fire Clay Mining Project, ML No.… — lapsed
- Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi,… — lapsed
- Fire Clay, Red & Yellow Ochre Mining Project located Near Village: Chandi,… — cleared for impact study
- "gudha Fire Clay Mining Project (M.L No. 05/1996)" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.