Quick answers
What is this project?
Proposed Granite stone (Minor Mineral) Mining project [M.L. No.75/2021, Khasra No. -6540/560] over an area 1.8117 ha. located near Village – Baghera, Tehsil – Kekri & Distt - Ajmer, (Rajasthan) with production capacity 1,50,000 TPA (ROM) (Saleable Mineral 75,000 TPA & Waste 75,000 TPA) by M/S Varaha Dev Stone as per EIA Notification dated 14.09.2006 is a proposed mining project in Baghera, Kekri, Ajmer, Rajasthan. The site covers 4.6 acres.
Who is building it?
The applicant is Puneet Gautam.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 May 2025), as of 27 Nov 2026.
Where is it?
In Baghera, Kekri, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 4.6 acres.
When was it filed?
The application was filed on 15 May 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 May 2025 |
| Application filed | 15 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Puneet Gautam |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Baghera |
| Taluk / tehsil | Kekri |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-29144 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Jul 2026 | Lapsed | 4.6 acres | ₹1.8 crore |
| Early planning filed 15 May 2025 (this page) | Cleared for impact study | 4.6 acres | ₹1.8 crore |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.6 acres, this one is smaller than 51% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 10.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 63 mining leases have applied within 5 km.
Where it is
Baghera, Kekri, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Granite stone (Minor Mineral) Mining project [M.L. No.75/2021, Khasra… — lapsed, 0 m away
- Cluster "Baghera" Granite Mining Project, ML. No. 22/2022, (Ref No… — environmental approval granted, 150 m away
- Cluster "Baghera" Granite Mining Project, ML. No. 22/2022, (Ref No… — cleared for impact study, 150 m away
- Sh. Bhupendra Singh Rathore (M.L. No. 61/2020), Granite Mining Project — environmental approval granted, 750 m away
- Sh. Bhupendra Singh Rathore (M.L. No. 61/2020) Granite Mining Project — withdrawn, 750 m away
- Sh. Bhupendra Singh Rathore (M.L. No. 61/2020), Granite Mining Project — cleared for impact study, 800 m away
- Cluster No. 79 Baghera Granite Mine — environmental approval granted, 800 m away
- Baghera Granite mining M.L No. 38/2021 — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.