Fresh proposal for"Ball Clay, Silica Sand, Bajri , Gravel & Murrum (Minor Mineral)mining project",[Ref. no.- 20221000063026 & M.L. No.-39/2022] over an Area of 2.1997Hectare with Proposed Production Capacity–3,81,440 TPA(ROM){Saleable Ball clay- 39600, Saleable Bajri-170560 TPA, Silica Sand-54080 TPA, Gravel/Murrum-93600 TPA, O.B- 19200 TPA & Waste- 4400 TPA},Located by Smt. Ganga Devi W/o Shri Murlidhar Kaswan

Fresh proposal for"Ball Clay, Silica Sand, Bajri , Gravel & Murrum (Minor Mineral)mining project",[Ref. no.- 20221000063026 & M.L. No.-39/2022] over an Area of 2.1997Hectare with Proposed Production Capacity–3,81,440 TPA(ROM){Saleable Ball clay- 39600, Saleable Bajri-170560 TPA, Silica Sand-54080 TPA, Gravel/Murrum-93600 TPA, O.B- 19200 TPA & Waste- 4400 TPA},Located by Smt. Ganga Devi W/o Shri Murlidhar Kaswan is a proposed mining project in Jaisinghdesar, Nokha, Bikaner, Rajasthan. The site covers 5.4 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Oct 2025).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Fresh proposal for"Ball Clay, Silica Sand, Bajri , Gravel & Murrum (Minor Mineral)mining project",[Ref. no.- 20221000063026 & M.L. No.-39/2022] over an Area of 2.1997Hectare with Proposed Production Capacity–3,81,440 TPA(ROM){Saleable Ball clay- 39600, Saleable Bajri-170560 TPA, Silica Sand-54080 TPA, Gravel/Murrum-93600 TPA, O.B- 19200 TPA & Waste- 4400 TPA},Located by Smt. Ganga Devi W/o Shri Murlidhar Kaswan is a proposed mining project in Jaisinghdesar, Nokha, Bikaner, Rajasthan. The site covers 5.4 acres.

Who is building it?

The applicant is Ganga Devi.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 7 Oct 2025), as of 27 Nov 2026.

Where is it?

In Jaisinghdesar, Nokha, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹2 crore and a site of 5.4 acres.

When was it filed?

The application was filed on 29 Sept 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Fresh proposal for"Ball Clay, Silica Sand, Bajri , Gravel & Murrum (Minor Mineral)mining…

Project details

Official titleFresh proposal for"Ball Clay, Silica Sand, Bajri , Gravel & Murrum (Minor Mineral)mining project",[Ref. no.- 20221000063026 & M.L. No.-39/2022] over an Area of 2.1997Hectare with Proposed Production Capacity–3,81,440 TPA(ROM){Saleable Ball clay- 39600, Saleable Bajri-170560 TPA, Silica Sand-54080 TPA, Gravel/Murrum-93600 TPA, O.B- 19200 TPA & Waste- 4400 TPA},Located at Near Village–Jaisinghdesar Kaliyan, Tehsil–Nokha & District–Bikaner (Rajasthan) by Smt. Ganga Devi W/o Shri Murlidhar Kaswan.
StatusCleared for impact study
Status since7 Oct 2025
Application filed29 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGanga Devi
Land area5.4 acres (2.2 ha)
Project cost₹2 crore
Village / localityJaisinghdesar
Taluk / tehsilNokha
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-29211

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jun 2026Environmental approval granted5.4 acres₹2 crore
Early planning filed 29 Sept 2025 (this page)Cleared for impact study5.4 acres₹2 crore

In context

516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.4 acres, this one is smaller than 88% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 13.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.

Where it is

Jaisinghdesar, Nokha, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.