Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Oct 2025 |
| Application filed | 27 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nirmal Kanwar |
| Land area | 158.5 acres (64.2 ha) |
| Project cost | ₹20 crore |
| Village / locality | Jamoli |
| Taluk / tehsil | Jahazpur |
| District | Bhilwara |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-29454 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 27 Oct 2025 (this page) | Cleared for impact study | 158.5 acres | ₹20 crore |
| Early planning filed 4 Aug 2025 | Cleared for impact study | 158.5 acres | ₹4 crore |
In context
2,489 applications in Bhilwara since January 2022 are in the same category (Mining): 1,323 approved, 124 filed or under review, and 1,042 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 158.5 acres, this one is larger than 98% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Jamoli, Jahazpur, Bhilwara, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River Sand (Bajri) Mining Project (Plot No. BJ-28, Plot area- 64.1615… — cleared for impact study, 0 m away
- Bajri (River Sand) Mining Project at Plot no. BJ-27, located at villages… — cleared for impact study, 2.2 km away
- Re appraisal of EC issued by DEIAA Jhamoli Quartz, Feldspar & Mica Mine (M.L.… — environmental approval granted, 2.5 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. BJ-42, Area-89.1236 ha.)… — cleared for impact study, 2.8 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. BJ-42, Plot area- 89.1236… — cleared for impact study, 2.8 km away
- Sh. Gopal Lal Jat, Mineral-Limestone (Burning), ML No.-323/1993 — environmental approval granted, 3.1 km away
- Transfer of Environmental Clearance from (Shri Dev Kishan Dhakar S/o Shri… — lapsed, 3.5 km away
- Reappraisal of Earlier Granted EC By DEIAA, Bhilwara. Vide Letter… — lapsed, 3.5 km away
More from Nirmal Kanwar in Bhilwara
- Proposed River Sand (Bajri) Mining Project (Plot No. BJ-42, Area-89.1236 ha.)… — cleared for impact study
- Proposed River Sand (Bajri) Mining Project (Plot No. BJ-42, Plot area- 89.1236… — cleared for impact study
- Proposed Granite mining Lease (M.L. No 19/2024,Ref No. 202410000103996,… — environmental approval granted
- Proposed Quartz & Feldspar Mining lease (M.L. No.337/2024, Area-1.3254 ha.) — cleared for impact study
- Proposed Quartz & Feldspar Mining lease (M.L. No.338/2024, Area-3.5918 ha.) — cleared for impact study
- Proposed Quartz & Feldspar Mining lease (M.L. No.13/2024, Area-1.1283 ha.) At… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.