Quick answers
What is this project?
"River Sand (Bajri) Mining Project, Plot No. 204" of applicant Vishnu Prakash R Punglia Limited is an approved mining project in Kanana, Pachpadra, Barmer, Rajasthan. The site covers 242.2 acres.
Who is building it?
The applicant is Vishnu Prakash R Punglia Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jan 2026), as of 27 Nov 2026.
Where is it?
In Kanana, Pachpadra, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹19.6 crore and a site of 242.2 acres.
When was it filed?
The application was filed on 17 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jan 2026 |
| Application filed | 17 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vishnu Prakash R Punglia Limited |
| Land area | 242.2 acres (98 ha) |
| Project cost | ₹19.6 crore |
| Village / locality | Kanana |
| Taluk / tehsil | Pachpadra |
| District | Barmer |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-29566 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Sept 2025 (this page) | Environmental approval granted | 242.2 acres | ₹19.6 crore |
| Early planning filed 3 Jun 2025 | Cleared for impact study | 242.2 acres | ₹19.6 crore |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 242.2 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Kanana, Pachpadra, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "River Sand (Bajri) Mining Project, Plot No. 204" of applicant Vishnu Prakash… — cleared for impact study, 50 m away
- River Sand (Bajri) (Minor mineral) Mining Project, Plot No.-205, Mining… — under environmental review, 1.8 km away
- River Sand (Bajri) (Minor mineral) Mining Project, Plot No.-205, Mining… — cleared for impact study, 1.8 km away
- River Sand (Bajri) (Minor mineral) Mining Project, Plot No.-205, Mining… — cleared for impact study, 1.8 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-205, Mining… — lapsed, 1.8 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot no. 203 for Mineral… — environmental approval granted, 1.8 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot no. 203 for Mineral… — cleared for impact study, 1.8 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No. 202 for Mineral… — lapsed, 3.5 km away
All 4 Vishnu Prakash R Punglia projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.