Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Dec 2025 |
| Application filed | 30 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Padma Ran Choudhary |
| Land area | 171 acres (69.2 ha) |
| Project cost | ₹3 crore |
| Village / locality | Madri |
| Taluk / tehsil | Ahore |
| District | Jalor |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-29733 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Aug 2025 (this page) | Environmental approval granted | 171 acres | ₹3 crore |
| Early planning filed 12 Jun 2025 | Cleared for impact study | 171 acres | ₹3 crore |
In context
466 applications in Jalor since January 2022 are in the same category (Mining): 201 approved, 50 filed or under review, and 215 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 171 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Madri, Ahore, Jalor, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining Lease Plot No. 21 for Mineral River Sand (Bajri) near village: Thanwla… — cleared for impact study, 0 m away
- Sh.Mahendra Singh Rajput Bajri (River Sand) Mining Project .Plot No-20… — environmental approval granted, 1.1 km away
- Sh.Mahendra Singh Rajput Bajri (River Sand) Mining Project .Plot No-20… — cleared for impact study, 1.1 km away
- M/s Jayveer Construction Company Bajri Mining Project over an area of 54.5448… — environmental approval granted, 1.7 km away
- M/s Jayveer Construction Company Bajri Mining Project over an area of 54.5448… — cleared for impact study, 1.7 km away
- "Bajri Mining Project, Delineated Plot No. 24" having mine lease area 67.4775… — cleared for impact study, 2.1 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No.19 for Mineral… — cleared for impact study, 2.2 km away
- Proposed River Bed Sand (Bajri)Mining Project for Plot No.18 near village:… — under environmental review, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.