What is Developing? Open the mapMap

Cleared for impact studyMining · Tonk, Rajasthan

River Sand (Bajri) Mining Project (Minor Mineral), Plot No-57, Bajri Plot No-17, Mining Lease/Plot Area- 62.9594 Ha., with Proposed Production Capacity-2266538.40 TPA (ROM) {Saleable Mineral-2266538.40 TPA & Waste- Nil, TPA} Located at Near Revenue Villages- Dodawari & Mundiya, Tehsil- Peeplu, District- Tonk, Rajasthan proposed by Yashoda enterprises.

River Sand (Bajri) Mining Project (Minor Mineral), Plot No-57, Bajri Plot No-17, Mining Lease/Plot Area- 62.9594 Ha., with Proposed Production Capacity-2266538.40 TPA (ROM) {Saleable Mineral-2266538.40 TPA & Waste- Nil, TPA} Located at Near Revenue Villages- Dodawari & Mundiya, Tehsil- Peeplu, District- Tonk, Rajasthan proposed by Yashoda enterprises is a proposed mining project in Dodwari, Peeplu, Tonk, Rajasthan. The site covers 155.6 acres. Its stated project cost is ₹37 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 May 2025).

See it on the live map All projects in Tonk

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

River Sand (Bajri) Mining Project (Minor Mineral), Plot No-57, Bajri Plot No-17, Mining Lease/Plot Area- 62.9594 Ha., with Proposed Production Capacity-2266538.40 TPA (ROM) {Saleable Mineral-2266538.40 TPA & Waste- Nil, TPA} Located at Near Revenue Villages- Dodawari & Mundiya, Tehsil- Peeplu, District- Tonk, Rajasthan proposed by Yashoda enterprises is a proposed mining project in Dodwari, Peeplu, Tonk, Rajasthan. The site covers 155.6 acres.

Who is building it?

The applicant is Aayush Rawat.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 May 2025), as of 27 Nov 2026.

Where is it?

In Dodwari, Peeplu, Tonk, Rajasthan.

How big is it?

It has a stated cost of ₹37 crore and a site of 155.6 acres.

When was it filed?

The application was filed on 30 Apr 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: River Sand (Bajri) Mining Project (Minor Mineral), Plot No-57, Bajri Plot No-17, Mining…

Project details

StatusCleared for impact study
Status since8 May 2025
Application filed30 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAayush Rawat
Land area155.6 acres (63 ha)
Project cost₹37 crore
Village / localityDodwari
Taluk / tehsilPeeplu
DistrictTonk
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-29754

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Nov 2025Environmental approval granted155.6 acres₹37 crore
Early planning filed 30 Apr 2025 (this page)Cleared for impact study155.6 acres₹37 crore

In context

362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 155.6 acres, this one is larger than 90% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 440.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Dodwari, Peeplu, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.