One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sandstone Mining Project; Q.L. Plot No.– 4 (Sukhpura–L), Area: 1.0238 Hect.…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 28 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Taj Alam |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Sukhpura |
| Taluk / tehsil | Bijoliya |
| District | Bhilwara |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-30782 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 19 Dec 2025 | Cleared for impact study | 2.5 acres | ₹1 crore |
| Early planning filed 28 May 2025 (this page) | Withdrawn | 2.5 acres | ₹1 crore |
In context
2,489 applications in Bhilwara since January 2022 are in the same category (Mining): 1,323 approved, 124 filed or under review, and 1,042 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 69% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 15.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 337 mining leases have applied within 5 km.
Where it is
Sukhpura, Bijoliya, Bhilwara, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sandstone Mining Project; Q.L. Plot No.– 4 (Sukhpura–L), Area: 1.0238… — cleared for impact study, 0 m away
- Proposed Sandstone Mining Project; Q.L. Plot No.– 2 (Sukhpura–L), Area: 1.0043… — cleared for impact study, 100 m away
- Proposed Sandstone Mining Project; Q.L. Plot No.– 5 (Sukhpura–L), Area: 1.1651… — under environmental review, 150 m away
- Proposed Sandstone Mining Project; Q.L. Plot No.–6 (Sukhpura–L), Area: 1.2242… — lapsed, 150 m away
- Proposed Sandstone Mining Project; Q.L. Plot No.–6 (Sukhpura–L), Area: 1.2242… — cleared for impact study, 150 m away
- Proposed Sandstone Mining Project; Q.L. Plot No.–3 (Sukhpura–L), Area: 1.0049… — cleared for impact study, 200 m away
- Qureshi Imran Khan — lapsed, 400 m away
- Mohani Devi Dhaker — lapsed, 400 m away
More from Taj Alam in Bhilwara
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.