Quick answers
What is this project?
Ec Name Transfer in Favour of M/S Jv Mines and Minerals From Vijendra Singh Ml No 29/2010 is a lapsed mining project in Jhajhu, Kolayat, Bikaner, Rajasthan. The site covers 7 acres.
Who is building it?
The applicant is Virendra Singh.
Has it been approved?
No. The application was lapsed on 25 Sept 2025, so it is no longer under consideration.
Where is it?
In Jhajhu, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹25 lakh and a site of 7 acres.
When was it filed?
The application was filed on 26 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Sept 2025 |
| Application filed | 26 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Virendra Singh |
| Land area | 7 acres (2.8 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Jhajhu |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-30794 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7 acres, this one is smaller than 84% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 33.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.
Where it is
Jhajhu, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Appraisal of EC Granted from DEIAA, Bikaner, of "Bajri & Gravel (Minor… — lapsed, 0 m away
- Transfer of environmental clearance of Bajri, Gravel, Mine Mining Project,… — environmental approval granted, 200 m away
- Ec Transfer From Ashok Kumar to Kailash Dudi — lapsed, 200 m away
- Reappraisal of Earlier Granted EC By DEIAA, Raj. Vide Letter No.… — environmental approval granted, 400 m away
- Reappraisal of Earlier Granted EC By DEIAA, Raj. Vide Letter No.… — withdrawn, 400 m away
- Reappraisal of Earlier Granted EC By DEIAA, Raj. Vide Letter No.… — lapsed, 400 m away
- "Re Appraisal of EC Granted from DEIAA Bikaner to SEIAA Rajasthan", for… — environmental approval granted, 450 m away
- Re Appraisal of Ec Granted From Deiaa of Gravel Bajri (Minor Mineral) Mining… — environmental approval granted, 700 m away
More from Virendra Singh in Bikaner
- Proposed Project Ball Clay, Bajri & Murrum ,Silica Sand , Gravel Kankar,… — cleared for impact study
- Proposed Project Ball Clay, Bajri & Murrum ,Silica Sand , Gravel Kankar,… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.