Quick answers
What is this project?
Proposed River Sand (Bajri) Mining Project, Plot No.-26, Area 76.09 Ha. (Govt. land), Near Village- Bithudakallan, Tehsil- Marwar Junction, Dist.- Pali (Raj.) of Applicant M/s Jai Shiv Shakti Traders, Prop. Shri Kheta Ram S/o Shri Narayan Ram is an approved mining project in Awa, Marwar Junction, Pali, Rajasthan. The site covers 188 acres.
Who is building it?
The applicant is Kheta Ram.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Feb 2026), as of 27 Nov 2026.
Where is it?
In Awa, Marwar Junction, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹5 crore and a site of 188 acres.
When was it filed?
The application was filed on 7 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Feb 2026 |
| Application filed | 7 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kheta Ram |
| Land area | 188 acres (76.1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Awa |
| Taluk / tehsil | Marwar Junction |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-31476 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Aug 2025 (this page) | Environmental approval granted | 188 acres | ₹5 crore |
| Early planning filed 28 May 2025 | Cleared for impact study | 188 acres | ₹5 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 188 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Awa, Marwar Junction, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River Sand (Bajri) Mining Project, Plot No.-26, Area 76.09 Ha. (Govt.… — cleared for impact study, 0 m away
- Proposed Project River Sand Mining Project Lease Area 70.4102 hect. Plot No.… — under environmental review, 3.7 km away
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD –… — under environmental review, 3.9 km away
- "Bajri Mining Project, Delineated Plot No 30" having mine lease area 31.7426… — cleared for impact study, 7.1 km away
- "Bajri Mining Project, Delineated Plot No. 47" having mine lease area of… — under environmental review, 7.5 km away
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJ-57/2025,… — under environmental review, 7.6 km away
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJ- 60/2025,… — cleared for impact study, 7.6 km away
- Bajri(River Sand) Mining lease at Plot No. BJRJD-48, Area-30.0798 Hectare,… — cleared for impact study, 8.1 km away
More from Kheta Ram in Pali
- Granite Mining Project Ref No 20221000060630 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.