Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 21 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Deburam |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Koliya |
| Taluk / tehsil | Didwana |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-31614 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jul 2026 | More information requested | 4.9 acres | ₹1.2 crore |
| Early planning filed 21 Jul 2025 (this page) | Cleared for impact study | 4.9 acres | ₹1.2 crore |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 71% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Koliya, Didwana, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fresh proposal for "Masonry Stone (minor mineral) mining project" [Reference.… — more information requested, 0 m away
- Transfer of Earlier Granted EC from Shri Ramdev Meghwal S/o Shri Laxman Ram… — environmental approval granted, 100 m away
- Re-appraisel of Ec granted by DIEAA Nagaur of Masonary Stone Mine… — environmental approval granted, 550 m away
- Existing Masonry Stone Mining Project (Non-Operational), M.L. No. 41/1989,… — environmental approval granted, 800 m away
- Smt. Dhapu Devi M.L. No. - 13/1991 , Masonary Stone Mining Project — lapsed, 900 m away
- Re Appraisal of EC granted by DEIAA, Nagaur (Rajasthan), of Existing Masonry… — environmental approval granted, 900 m away
- Re-Appraisal of EC Granted from DEIAA Nagaur To SEIAA "Masonary Stone (Minor… — environmental approval granted, 900 m away
- Transfer of Earlier Granted EC from Shri Satya Narayan Sharma S/o Shri Surya… — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.