What is Developing? Open the mapMap

Environmental approval grantedMining · Barmer, Rajasthan

Proposed Project for River Bed Sand Mining (Bajri) Plot No. 218 (for Mineral River Bed Sand (Bajri) near village: Adarsh Sada, Tehsil- Sindhari, and District: Balotra, for an area is 81.3911 hectare. Proposed Production –549389.25 TPA (ROM)

Proposed Project for River Bed Sand Mining (Bajri) Plot No. 218 (for Mineral River Bed Sand (Bajri) near village: Adarsh Sada, Tehsil- Sindhari, and District: Balotra, for an area is 81.3911 hectare. Proposed Production –549389.25 TPA (ROM) is an approved mining project in Na, Sindhari, Barmer, Rajasthan. The site covers 201.1 acres. Its stated project cost is ₹13 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Jun 2025).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project for River Bed Sand Mining (Bajri) Plot No. 218 (for Mineral River Bed Sand (Bajri) near village: Adarsh Sada, Tehsil- Sindhari, and District: Balotra, for an area is 81.3911 hectare. Proposed Production –549389.25 TPA (ROM) is an approved mining project in Na, Sindhari, Barmer, Rajasthan. The site covers 201.1 acres.

Who is building it?

The applicant is Viratra Infrastructure.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Jun 2025), as of 27 Nov 2026.

Where is it?

In Na, Sindhari, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹13 crore and a site of 201.1 acres.

When was it filed?

The application was filed on 17 May 2025.

Project details

StatusEnvironmental approval granted
Status since25 Jun 2025
Application filed17 May 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantViratra Infrastructure
Land area201.1 acres (81.4 ha)
Project cost₹13 crore
Village / localityNa
Taluk / tehsilSindhari
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-31838

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 May 2025 (this page)Environmental approval granted201.1 acres₹13 crore
Early planning filed 6 Mar 2025Cleared for impact study201.1 acres₹13 crore

In context

878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 201.1 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Na, Sindhari, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.