Proposed Residential Housing Project "Astitva Anant"

Proposed Residential Housing Project "Astitva Anant" is a lapsed building project in Kota Municipal Area, Ladpura, Kota, Rajasthan. The site covers 1.2 acres. Its stated project cost is ₹42.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 26 Nov 2026).

See it on the live map All projects in Kota

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Housing Project "Astitva Anant"

Project details

StatusLapsed
Status since26 Nov 2026
Application filed19 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHorizon Projects and Infrastructure Private Limited
Land area1.2 acres (0.5 ha)
Project cost₹42.5 crore
Village / localityKota Municipal Area
Taluk / tehsilLadpura
DistrictKota
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32191

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Oct 2026 (this page)Lapsed1.2 acres₹42.5 crore
New project filed 1 Mar 2023Application filed1.2 acres₹42.5 crore

What the filings say

What is planned

According to the applicant's project report, Astitva Anant is a residential housing project comprising a single building block with 187 dwelling units. The structure is designed with two stilt levels and 13 upper floors, reaching a height of 46.50 metres to the terrace level and 49.25 metres to the machine room.

The residential units are distributed as follows:

The project includes 123.52 square metres of community facilities, featuring a gymnasium, community hall, indoor games area, and a society office. The 13th floor is planned with a mix of 3 BHK and 4 BHK units, while the terrace will house solar panels.

Layout and design

The project is situated on a total plot area of 4,837.92 square metres (0.48 hectares). The proposed ground coverage is 1,629 square metres (33.67%), which is within the permissible limit of 40%. The total built-up area is 25,376 square metres.

Parking is planned for 224 Equivalent Car Units (ECU), exceeding the required 209 ECU. The arrangement includes:

ItemDetail
Total Plot Area4,837.92 sq. m. (1.19 acres)
Built-up Area25,376 sq. m.
Ground Coverage1,629 sq. m. (33.67%)
Landscape Area517.15 sq. m. (10.69%)
Paved and Parking Area2,691.77 sq. m. (55.64%)
Total Dwelling Units187
Maximum Height49.25 m

Land and surroundings

The project site is located at Plot No. A, B, C, D, and E on Station Road, Civil Lines, Kota. The land was reconstituted by the Urban Improvement Trust, Kota, in 2013.

Surrounding landmarks include the M.B.S. Hospital and the Kota Junction railway station, which is approximately 2.75 km to the northeast. The Kota Airport is 4.5 km away towards the south-southwest. Environmental documents note the site is 4.93 km from the National Chambal Gharial Sanctuary and 14.26 km from the Mukundara Hills Tiger Reserve.

Water, power and access

The total daily water requirement is estimated at 159 kilolitres per day (KLD). This includes a fresh water demand of 100 KLD, to be sourced from the Public Health Engineering Department (PHED) or groundwater, and 59 KLD of recycled water for flushing and landscaping.

The electrical connected load is 2,000.81 KW, with a maximum demand of 1,007.90 KW, supplied by Jaipur Vidyut Vitran Nigam Limited (JVVNL). Power backup will be provided by one 125 kVA diesel generator set. For renewable energy, a 50 KW rooftop grid-tied solar photovoltaic system is planned.

Environmental safeguards

A sewage treatment plant (STP) with a capacity of 160 KLD using Moving Bed Biofilm Reactor (MBBR) technology will be installed to treat an estimated 133 KLD of wastewater. Treated water will be reused through a dual plumbing system.

Solid waste generation is projected at 515 kg per day, consisting of 309 kg of biodegradable waste and 206 kg of non-biodegradable waste. An organic waste converter with a capacity of 350 kg per day will process the biodegradable portion into manure.

For storm water management, two rainwater harvesting pits (3m x 3m x 3m) are proposed. The landscape plan includes the plantation of 194 trees, using native species such as Ashok, Karanj, Champa, Shisham, Neem, and Gulmohar.

Residential Housing Project Astitva Anant site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Residential Housing Project Astitva Anant: Site plan: building block, setbacks and surrounding properties (preview)🔒 Sign in free to see it
Site plan: building block, setbacks and surrounding properties
Residential Housing Project Astitva Anant: STP Schematic: MBBR technology process flow (preview)🔒 Sign in free to see it
STP Schematic: MBBR technology process flow
Residential Housing Project Astitva Anant: Wind rose diagram for Kota region (preview)🔒 Sign in free to see it
Wind rose diagram for Kota region
Residential Housing Project Astitva Anant: Plot layout: individual parcel boundary and dimensions (preview)🔒 Sign in free to see it
Plot layout: individual parcel boundary and dimensions

In context

22 applications in Kota since January 2022 are in the same category (Buildings & townships): 5 approved, 8 filed or under review, and 9 withdrawn, lapsed or rejected. At 1.2 acres, this one is smaller than 95% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kota Municipal Area, Ladpura, Kota, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.