What is Developing? Open the mapMap

Under environmental reviewMining · Sikar, Rajasthan

Proposed Enhancement in Mining Lease area from existing lease area of 1.00 ha. to 1.4251ha. by addition of Gap Area( 0.4251 ha.) & Enhancement in production capacity from existing Production capacity of 150000TPA to 181500TPA (ROM) in Existing Masonry Stone Mining Project, M.L. No. 694/2010, Area- 1.4251hec, Near Village- Nimod, Tehsil- Neem ka Thana, Dist.- Sikar (Raj.) applicant of M/s Krishna Grit Udhyog.

Proposed Enhancement in Mining Lease area from existing lease area of 1.00 ha. to 1.4251ha. by addition of Gap Area( 0.4251 ha.) & Enhancement in production capacity from existing Production capacity of 150000TPA to 181500TPA (ROM) in Existing Masonry Stone Mining Project, M.L. No. 694/2010, Area- 1.4251hec, Near Village- Nimod, Tehsil- Neem ka Thana, Dist.- Sikar (Raj.) applicant of M/s Krishna Grit Udhyog is a proposed mining project in Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The site covers 3.5 acres. Its stated project cost is ₹2.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 30 Oct 2026).

See it on the live map All projects in Sikar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Enhancement in Mining Lease area from existing lease area of 1.00 ha. to 1.4251ha. by addition of Gap Area( 0.4251 ha.) & Enhancement in production capacity from existing Production capacity of 150000TPA to 181500TPA (ROM) in Existing Masonry Stone Mining Project, M.L. No. 694/2010, Area- 1.4251hec, Near Village- Nimod, Tehsil- Neem ka Thana, Dist.- Sikar (Raj.) applicant of M/s Krishna Grit Udhyog is a proposed mining project in Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The site covers 3.5 acres.

Who is building it?

The applicant is Krishna Grit Udhyog.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Nimod, Neem-Ka-Thana, Sikar, Rajasthan.

How big is it?

It has a stated cost of ₹2.5 crore and a site of 3.5 acres.

When was it filed?

The application was filed on 27 Mar 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Enhancement in Mining Lease area from existing lease area of 1.00 ha. to…

Project details

StatusUnder environmental review
Status since30 Oct 2026
Application filed27 Mar 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantKrishna Grit Udhyog
Land area3.5 acres (1.4 ha)
Project cost₹2.5 crore
Village / localityNimod
Taluk / tehsilNeem-Ka-Thana
DistrictSikar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32198

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Mar 2026 (this page)Under environmental review3.5 acres₹2.5 crore
Early planning filed 23 Apr 2025Cleared for impact study3.5 acres₹2.5 crore

In context

837 applications in Sikar since January 2022 are in the same category (Mining): 470 approved, 62 filed or under review, and 305 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.5 acres, this one is larger than 69% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 13.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 100 mining leases have applied within 5 km.

Where it is

Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Krishna Grit Udhyog in Sikar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.