Existing (Non-Operational) Bajri/Gravel Mining Project ; M.L. No -95/1996, Area: 3.56 Hect., Near Village- Nal Chhoti, Tehsil & District- Bikaner (Raj.) in favor of Sidhi Vinayak Mines And Minerals is a lapsed mining project in Nal Khurd, Bikaner, Rajasthan. The site covers 8.8 acres.
Who is building it?
The applicant is Hanuman Mal Ranka.
Has it been approved?
No. The application was lapsed on 22 Nov 2026, so it is no longer under consideration.
Where is it?
In Nal Khurd, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 8.8 acres.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Nov 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Hanuman Mal Ranka |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹2 crore |
| Village / locality | Nal Khurd |
| Taluk / tehsil | Bikaner |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-32309 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.8 acres, this one is smaller than 76% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 50.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Nal Khurd, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Airports Authority of India Plans a ₹209-Crore Expansion for Bikaner Airport, Rajasthan (5.5 km away).
Other projects nearby
- This is an Existing Case "Re-Appraisal of EC Granted from DEIAA BIKANER to… — environmental approval granted, 250 m away
- Transfer of Earlier Granted EC from Shri Jaichand Lal Daga to M/s Sidhi… — lapsed, 250 m away
- Nal Chhoti Ball Clay & Fire Clay, Silica Sand, Gravel & Murram (M.L. No.… — cleared for impact study, 400 m away
- Ball Clay, Silica sand Mining Lease M.L.No. 44/2018 (Ref. No. 201810000808),… — lapsed, 500 m away
- Ball Clay, Silica sand Mining Lease M.L.No. 44/2018 (Ref. No. 201810000808),… — cleared for impact study, 500 m away
- Nal Chhoti Ball Clay, Fire Clay, Silica Sand, Gravel & Murram Mines [M.L. No.… — cleared for impact study, 500 m away
- Transfer of EC for BALL CLAY, SILICA SAND (MINOR MINERAL) M.L. No.-11/2018 In… — lapsed, 550 m away
- Reappraisal of the EC granted by DEIAA Bikaner for Fire Clay & White Clay… — environmental approval granted, 550 m away
More from Hanuman Mal Ranka in Bikaner
- This is an Existing Case "Re-Appraisal of EC Granted from DEIAA BIKANER to… — environmental approval granted
- Transfer of Earlier Granted EC from Shri Jaichand Lal Daga to M/s Sidhi… — lapsed