What is Developing? Open the mapMap

Cleared for impact studyIndustry · Udaipur, Rajasthan

Proposed Expansion of Chemical Fertilizer Manufacturing Unit located at Araji No. 4793, 4794, 4795, 4796 and 4798, Village Umerda , Tehsil:Girwa, District: Udaipur (Rajasthan)

Proposed Expansion of Chemical Fertilizer Manufacturing Unit located at Araji No. 4793, 4794, 4795, 4796 and 4798, Village Umerda , Tehsil:Girwa, District: Udaipur (Rajasthan) is a proposed industrial project in Kanpur (First), Girwa, Udaipur, Rajasthan. The site covers 9.9 acres. Its stated project cost is ₹71.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Apr 2026).

See it on the live map All projects in Udaipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Chemical Fertilizer Manufacturing Unit located at Araji No. 4793,…

Project details

StatusCleared for impact study
Status since16 Apr 2026
Application filed27 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNm India Bio Private Limited
Land area9.9 acres (4 ha)
Project cost₹71.1 crore
Village / localityKanpur (First)
Taluk / tehsilGirwa
DistrictUdaipur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32383

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 24 Sept 2026Environmental approval granted9.9 acres₹71.1 crore
Early planning filed 27 Feb 2026 (this page)Cleared for impact study9.9 acres₹71.1 crore

In context

38 applications in Udaipur since January 2022 are in the same category (Industry): 27 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 66% of them.

85 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kanpur (First), Girwa, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.