One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Chemical Fertilizer Manufacturing Unit located at Araji No. 4793,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 27 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nm India Bio Private Limited |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹71.1 crore |
| Village / locality | Kanpur (First) |
| Taluk / tehsil | Girwa |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-32383 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Sept 2026 | Environmental approval granted | 9.9 acres | ₹71.1 crore |
| Early planning filed 27 Feb 2026 (this page) | Cleared for impact study | 9.9 acres | ₹71.1 crore |
In context
38 applications in Udaipur since January 2022 are in the same category (Industry): 27 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 66% of them.
85 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanpur (First), Girwa, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Chemical Fertilizer Manufacturing Unit located at Araji… — environmental approval granted, 0 m away
- Mining project by M/s B.N Ennterprises (ML No 49/2007) — environmental approval granted, 1000 m away
- Proposed Dyes & Dye Intermediates Manufacturing Unit With Production Capacity… — cleared for impact study, 1000 m away
- M/s Shiv Crushing Plant (Umarda Masonry Stone Mine, M. L. No. 34/2006) — lapsed, 1 km away
- M/s Shiv Crushing Plant (Umarda Masonry Stone Mine, M. L. No. 34/2006) — environmental approval granted, 1 km away
- M/s Shiv Crushing Plant (Umarda Masonry Mine, M. L. No. 50/2005) — lapsed, 1.1 km away
- M/s Shiv Crushing Plant (Umarda Masonry Mine, M. L. No. 50/2005) — environmental approval granted, 1.1 km away
- Umarda Masonry Stone Mine (M. L. No. 29/2005) — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.