What is Developing? Open the mapMap

Under environmental reviewMining · Sawai Madhopur, Rajasthan

Fresh proposal for "Masonry Stone (Minor Mineral) mining project" [Plot. No.- 20] over an Area of 1.69 Hectares with Proposed Production Capacity–1,51,250 TPA (ROM) {Saleable– 1,43,687.5 TPA & Waste – 7,562.5 TPA}

Fresh proposal for "Masonry Stone (Minor Mineral) mining project" [Plot. No.- 20] over an Area of 1.69 Hectares with Proposed Production Capacity–1,51,250 TPA (ROM) {Saleable– 1,43,687.5 TPA & Waste – 7,562.5 TPA} is a proposed mining project in Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 4.2 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 2 Nov 2026).

See it on the live map All projects in Sawai Madhopur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Fresh proposal for "Masonry Stone (Minor Mineral) mining project" [Plot. No.- 20] over an Area of 1.69 Hectares with Proposed Production Capacity–1,51,250 TPA (ROM) {Saleable– 1,43,687.5 TPA & Waste – 7,562.5 TPA} is a proposed mining project in Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 4.2 acres.

Who is building it?

The applicant is Khatushyam Natural Resources Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan.

How big is it?

It has a stated cost of ₹1.3 crore and a site of 4.2 acres.

When was it filed?

The application was filed on 30 Jul 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Fresh proposal for "Masonry Stone (Minor Mineral) mining project" [Plot. No.- 20] over…

Project details

Official titleFresh proposal for "Masonry Stone (Minor Mineral) mining project" [Plot. No.- 20] over an Area of 1.69 Hectares with Proposed Production Capacity–1,51,250 TPA (ROM) {Saleable– 1,43,687.5 TPA & Waste – 7,562.5 TPA}, Located at Near Village– Syaroli, Tehsil-Wazirpur District- Sawai Madhopur (Rajasthan)by M/s Khatushyam Natural Resources Pvt. Ltd.
StatusUnder environmental review
Status since2 Nov 2026
Application filed30 Jul 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKhatushyam Natural Resources Private Limited
Land area4.2 acres (1.7 ha)
Project cost₹1.3 crore
Village / localitySyaroli
Taluk / tehsilWazeerpur
DistrictSawai Madhopur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32489

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Jul 2026 (this page)Under environmental review4.2 acres₹1.3 crore
Early planning filed 9 Oct 2025Cleared for impact study4.2 acres₹1.3 crore

In context

235 applications in Sawai Madhopur since January 2022 are in the same category (Mining): 97 approved, 46 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.2 acres, this one is larger than 81% of them.

25 other mining leases have applied within 500 m of this site; together with this one they cover 73.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 77 mining leases have applied within 5 km.

Where it is

Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Khatushyam Natural Resources Private Limited in Sawai Madhopur

All 8 Khatushyam Natural Resources projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.