Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhiwadi Girt PVT LTD |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Chauppanki |
| Taluk / tehsil | Tijara |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-32705 |
In context
347 applications in Alwar since January 2022 are in the same category (Mining): 131 approved, 47 filed or under review, and 169 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 95% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 9.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Chauppanki, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Bhiwadi Girt PVT. LTD. [patthar Chunai Mining Project, M.L. No. 129/1997,… — under environmental review, 100 m away
- M/S Deeva Construction Product Industries [patthar Chunai Mining Project, M.L.… — environmental approval granted, 100 m away
- M/s Deeva Construction Product Industries Existing "Pathar Chunai (Minor… — environmental approval granted, 250 m away
- Proposed Thermosetting Moulding Powder (Melamine Formaldehyde powder and Urea… — cleared for impact study, 300 m away
- Proposed Thermosetting Moulding Powder (Melamine Formaldehyde powder and Urea… — cleared for impact study, 550 m away
- Expansion in production capacity of existing Thermosetting Moulding Powder… — cleared for impact study, 900 m away
- Thermosetting Moulding Powder Manufacturing Unit of 25 MT/day located at… — cleared for impact study, 950 m away
- M/s Chanchal Gurjar Mines Stone Company Prop. Beer Singh, M.L No.- 155/2008,… — lapsed, 1.5 km away
More from Bhiwadi Girt PVT LTD in Alwar
- M/S Bhiwadi Girt PVT. LTD. [patthar Chunai Mining Project, M.L. No. 129/1997,… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.