Quick answers
What is this project?
Transfer of EC of our Existing Sand Stone Mining Project M.L. No. 08/2018 (Plot No.- 08), Area: 1.0ha. located Near Village- Kasti, Tehsil-Baori , District- Jodhpur (Raj.) from Smt. Sarita Ojha W/o Shri Amit Ojha. to M/S Beniwal Construction (Prop.)Prabhu Ram S/o Himmata Ram is a lapsed mining project in Kasti, Baori, Jodhpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Prabhu Ram.
Has it been approved?
No. The application was lapsed on 6 May 2026, so it is no longer under consideration.
Where is it?
In Kasti, Baori, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹30 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 6 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 May 2026 |
| Application filed | 6 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Prabhu Ram |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Kasti |
| Taluk / tehsil | Baori |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-32836 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 178 mining leases have applied within 5 km.
Where it is
Kasti, Baori, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project Sandstone Mining, Plot No. 06, area 1.0 hect Near Village… — cleared for impact study, 150 m away
- Proposed Project Sandstone Mining, Plot No. 06, area 1.0 hect Near Village… — cleared for impact study, 150 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 87,698 TPA… — under environmental review, 600 m away
- Sand Stone Mining Project, Area 1.00 ha. and Plot No.- 63, with production… — lapsed, 600 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 87,698 TPA… — returned to applicant, 600 m away
- Cluster Kasti Sand Stone Mining Project, Plot No. 19, Applied Area 1.00 Hect.… — more information requested, 650 m away
- Kasti Sand Stone Mining Project Plot No. 19 Favor of Smt Raisa Vishnoi — withdrawn, 650 m away
- Proposed Sand Stone Mining Project, Plot.No.-19, Area- 1.0 Ha, Near… — cleared for impact study, 650 m away
More from Prabhu Ram in Jodhpur
- Proposed Sandstone & Masonry Stone Mining Project, Plot No. 154, area 1.0… — cleared for impact study
- 261, Keru — lapsed
- 260,keru — lapsed
- 230, Keru — environmental approval granted
- QL 1643 bkt Prabhu ram — environmental approval granted
- Ql No 617 Area Bhomiya Ji Ka Than Balesar — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.