What is Developing? Open the mapMap

Under environmental reviewMining · Bundi, Rajasthan

M/s Sunrise Developers, Sand Stone & Khanda (Masonary Stone) Mining Project (Plot No.65), Lease Area- 1.00 Hect., Cluster Area- 42.00 Hect., Proposed Production Capacity: 140387 TPA (ROM) {Saleable (Sand Stone) Mineral: 27987 TPA Saleable (Khanda- Masonary Stone) Mineral: 95982 TPA Soil: 4369 TPA Waste: 12049 TPA}, Near Village- Dhaneshwar, Tehsil- Talera, District- Bundi and State- Rajasthan

M/s Sunrise Developers, Sand Stone & Khanda (Masonary Stone) Mining Project (Plot No.65), Lease Area- 1.00 Hect., Cluster Area- 42.00 Hect., Proposed Production Capacity: 140387 TPA (ROM) {Saleable (Sand Stone) Mineral: 27987 TPA Saleable (Khanda- Masonary Stone) Mineral: 95982 TPA Soil: 4369 TPA Waste: 12049 TPA}, Near Village- Dhaneshwar, Tehsil- Talera, District- Bundi and State- Rajasthan is a proposed mining project in Dhaneshwar, Talera, Bundi, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 23 Oct 2026).

See it on the live map All projects in Bundi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since23 Oct 2026
Application filed18 Sept 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSunrise Developers
Land area2.5 acres (1 ha)
Project cost₹1.5 crore
Village / localityDhaneshwar
Taluk / tehsilTalera
DistrictBundi
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32977

In context

865 applications in Bundi since January 2022 are in the same category (Mining): 460 approved, 104 filed or under review, and 301 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 93% of them.

32 other mining leases have applied within 500 m of this site; together with this one they cover 195.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 110 mining leases have applied within 5 km.

Where it is

Dhaneshwar, Talera, Bundi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sunrise Developers in Bundi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.