One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sandstone Mining Project, Q.L Plot No.- 08, Area- 1.3011Ha., Near Village -…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 2 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Third Eye Infratech Private Limited |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹2 crore |
| Village / locality | Sukhpura |
| Taluk / tehsil | Bijoliya |
| District | Bhilwara |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33085 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jul 2026 | Environmental approval granted | 3.2 acres | ₹2 crore |
| Early planning filed 2 Feb 2026 (this page) | Under environmental review | 3.2 acres | ₹2 crore |
In context
2,489 applications in Bhilwara since January 2022 are in the same category (Mining): 1,323 approved, 124 filed or under review, and 1,042 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.2 acres, this one is smaller than 63% of them.
46 other mining leases have applied within 500 m of this site; together with this one they cover 67.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 357 mining leases have applied within 5 km.
Where it is
Sukhpura, Bijoliya, Bhilwara, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sandstone Mining Project, Q.L Plot No.- 08, Area- 1.3011Ha., Near… — environmental approval granted, 0 m away
- Shri Chandresh Ranka, Sand Stone Mining Project (Plot No.7), Lease Area- 1.08… — under environmental review, 100 m away
- Sh. Manish Lohiya , Sand Stone Mining Project (Plot No. 09), Proposed… — cleared for impact study, 150 m away
- M/s Shree Nath Stone, Sand Stone Mining Project (Plot No.11), Lease Area-… — cleared for impact study, 150 m away
- Proposed Sandstone Mining Project; Plot No. 06 (Sukhpura- O), Area: 1.08 Hect.… — under environmental review, 150 m away
- Proposed Sandstone Mining Project; Plot No. 10 (Sukhpura- O), Area: 1.3297… — under environmental review, 200 m away
- Regarding addition of Strip Land in Existing (Non-Operational) Sandstone… — cleared for impact study, 200 m away
- Proposed Sandstone Mining Project ;Q.L. Plot No.-01 , Area :- 1.1264 ha ; Near… — cleared for impact study, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.