Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Original Mineral Industries |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Bhankri |
| Taluk / tehsil | Rajgarh |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33097 |
In context
347 applications in Alwar since January 2022 are in the same category (Mining): 131 approved, 47 filed or under review, and 169 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Bhankri, Rajgarh, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Environmental Clearance of Masonry Stone Mining Project, M.L.… — lapsed, 100 m away
- Mining of Masonry Stone — lapsed, 6.6 km away
- Interlocking tiles road from the public water tank to Bhomiya Baba place — lapsed, 7.1 km away
- Renewal/Extension of Diversion Period for M.L. No. - 613/90 (R - 86/2007,… — lapsed, 7.6 km away
- Amendment in EC (Mineral Inclusion of Masonry Stone, Quartz & Quarry Rubbish… — environmental approval granted, 7.8 km away
- Renewal of Road from Rajgarh to Jamdoli — forest land use approved, 8.2 km away
- Abp_alwar_rajgarh2 — lapsed, 9.5 km away
- Mobile Tower Installation By Bsnl — application filed, 9.7 km away
More from Original Mineral Industries in Alwar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.