Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 26 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | M/S Shreenath Enterprises PVT. LTD. |
| Land area | 21.6 acres (8.7 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Chechat |
| Taluk / tehsil | Ramganj Mandi |
| District | Kota |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33311 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Jun 2026 (this page) | Cleared for impact study | 21.6 acres | ₹2.1 crore |
| Early planning filed 4 Apr 2026 | Cleared for impact study | 21.6 acres | ₹2.1 crore |
In context
175 applications in Kota since January 2022 are in the same category (Mining): 116 approved, 25 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 21.6 acres, this one is larger than 94% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 32.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 32 mining leases have applied within 5 km.
Where it is
Chechat, Ramganj Mandi, Kota, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Lime Stone (Building Stone) Mining Project, Reference No.:… — cleared for impact study, 0 m away
- Proposed Limestone (Dimensional), Limestone (Dimensional Waste) & Masonry… — lapsed, 250 m away
- M/s P.C. Bangur Minerals Limited, Environmental Clearance for Lime Stone… — under environmental review, 750 m away
- M/s P.C. Bangur Minerals Limited,Term Of Reference For Environmental Clearance… — under environmental review, 750 m away
- M/s P.C. Bangur Minerals Limited,Term Of Reference For Environmental Clearance… — environmental approval granted, 750 m away
- M/s P.C. Bangur Minerals Limited,Term Of Reference For Environmental Clearance… — cleared for impact study, 750 m away
- Re-appraisal of Existing Limestone (Building Stone) Mining Project, ML. No.-… — environmental approval granted, 950 m away
- Re-appraisal of Existing Limestone (Building Stone) Mining Project, ML. No.-… — lapsed, 950 m away
More from M/S Shreenath Enterprises PVT. LTD. in Kota
3 Shreenath Enterprises projects in Kota
All 5 Shreenath Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.