What is Developing? Open the mapMap

LapsedMining · Bikaner, Rajasthan

"Silica Sand, Bajri, Ball Clay, Gravel & Murrum (Minor Mineral) mining project" over an area - 3.201 hectares, Ref. No. 202410000111075 & ML.No.-39/2024 with Proposed Production Capacity - 449249 TPA (ROM){Ball Clay – 65596 TPA, Silica Sand – 242423 TPA, Bajri – 42780 TPA, Gravel/Murrum – 68900 TPA, Over Burden -22260 TPA & Waste-7288 TPA}, located Near Village – Deshnok, Tehsil & District – Bikaner (Rajasthan) by Shri Omprakash S/o Shri Pokar Ram .

"Silica Sand, Bajri, Ball Clay, Gravel & Murrum (Minor Mineral) mining project" over an area - 3.201 hectares, Ref. No. 202410000111075 & ML.No.-39/2024 with Proposed Production Capacity - 449249 TPA (ROM){Ball Clay – 65596 TPA, Silica Sand – 242423 TPA, Bajri – 42780 TPA, Gravel/Murrum – 68900 TPA, Over Burden -22260 TPA & Waste-7288 TPA}, located Near Village – Deshnok, Tehsil & District – Bikaner (Rajasthan) by Shri Omprakash S/o Shri Pokar Ram is a lapsed mining project in Deshnokh, Bikaner, Rajasthan. The site covers 7.9 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Aug 2026).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Silica Sand, Bajri, Ball Clay, Gravel & Murrum (Minor Mineral) mining project" over an area - 3.201 hectares, Ref. No. 202410000111075 & ML.No.-39/2024 with Proposed Production Capacity - 449249 TPA (ROM){Ball Clay – 65596 TPA, Silica Sand – 242423 TPA, Bajri – 42780 TPA, Gravel/Murrum – 68900 TPA, Over Burden -22260 TPA & Waste-7288 TPA}, located Near Village – Deshnok, Tehsil & District – Bikaner (Rajasthan) by Shri Omprakash S/o Shri Pokar Ram is a lapsed mining project in Deshnokh, Bikaner, Rajasthan. The site covers 7.9 acres.

Who is building it?

The applicant is Omprakash.

Has it been approved?

No. The application was lapsed on 29 Aug 2026, so it is no longer under consideration.

Where is it?

In Deshnokh, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 7.9 acres.

When was it filed?

The application was filed on 29 Jul 2026.

Project details

StatusLapsed
Status since29 Aug 2026
Application filed29 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantOmprakash
Land area7.9 acres (3.2 ha)
Project cost₹1.5 crore
Village / localityDeshnokh
Taluk / tehsilBikaner
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33415

In context

516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.9 acres, this one is smaller than 79% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 16.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.

Where it is

Deshnokh, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Omprakash in Bikaner

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.