Quick answers
What is this project?
Proposed Silica Sand Mining Project; Plot No. -204, Area: 4.50 Hect. Near Village:-Parewar, Tehsil- Jaisalmer, District:- Jaisalmer (Raj.) in favor of Shri Balaji Stone Suppliers, Prop. Shri Veerma Ram S/o Shri Uda Ram is a lapsed mining project in Parewar, Jaisalmer, Rajasthan. The site covers 11.1 acres.
Who is building it?
The applicant is Veerma Ram.
Has it been approved?
No. The application was lapsed on 18 Oct 2026, so it is no longer under consideration.
Where is it?
In Parewar, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 11.1 acres.
When was it filed?
The application was filed on 15 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Silica Sand Mining Project; Plot No. -204, Area: 4.50 Hect. Near…
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Oct 2026 |
| Application filed | 15 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Veerma Ram |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹2 crore |
| Village / locality | Parewar |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33544 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 18 Nov 2026 | Cleared for impact study | 11.1 acres | ₹2 crore |
| Early planning filed 15 Jun 2026 (this page) | Lapsed | 11.1 acres | ₹2 crore |
In context
575 applications in Jaisalmer since January 2022 are in the same category (Mining): 231 approved, 103 filed or under review, and 241 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 11.1 acres, this one is larger than 75% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 122.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 80 mining leases have applied within 5 km.
Where it is
Parewar, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Silica Sand Mining Project; Plot No. -204, Area: 4.50 Hect. Near… — cleared for impact study, 0 m away
- Proposed Silica Sand Mining Project; Plot No.– 201, Area: 4.50 Hect., Near… — under environmental review, 200 m away
- Proposed Silica Sand Mining Project; Plot No. -205, Area: 4.50 Hect. Near… — under environmental review, 200 m away
- Parewar Silica Sand Mining Project, Plot No.- 205, Near Village-Parewar,… — lapsed, 250 m away
- Proposed Silica Sand Mining Project; Plot No. -214, Area: 4.50 Hect. Near… — cleared for impact study, 300 m away
- Proposed Silica Sand Mining Project; Plot No.– 202, Area: 4.5 Hect. Near… — under environmental review, 300 m away
- TOR for Proposed Silica Sand Cluster Mining Project, Plot No.200, Area 4.50… — initial checks, 300 m away
- TOR for Proposed Silica Sand Cluster Mining Project, Plot No.200, Area 4.50… — cleared for impact study, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.