What is Developing? Open the mapMap

Cleared for impact studyMining · Bikaner, Rajasthan

"Ball Clay, Silica Sand, Bajri, Kankar, Gravel and Murrum Mining Project, Delineated Plot No 82/2024" having mine lease area: 4.00 hectare located near Village- Indo ka Bala, Tehsil- Kolayat & District: Bikaner, Rajasthan with proposed production Proposed Production capacity: 2,67,320 TPA (ROM) in the name of Sh. Jaichand Lal Daga S/o Late Sh. Champa Lal Daga.

"Ball Clay, Silica Sand, Bajri, Kankar, Gravel and Murrum Mining Project, Delineated Plot No 82/2024" having mine lease area: 4.00 hectare located near Village- Indo ka Bala, Tehsil- Kolayat & District: Bikaner, Rajasthan with proposed production Proposed Production capacity: 2,67,320 TPA (ROM) in the name of Sh. Jaichand Lal Daga S/o Late Sh. Champa Lal Daga is a proposed mining project in Inda Ka Bala, Kolayat, Bikaner, Rajasthan. The site covers 9.9 acres. Its stated project cost is ₹2.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Feb 2026).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Ball Clay, Silica Sand, Bajri, Kankar, Gravel and Murrum Mining Project, Delineated Plot No 82/2024" having mine lease area: 4.00 hectare located near Village- Indo ka Bala, Tehsil- Kolayat & District: Bikaner, Rajasthan with proposed production Proposed Production capacity: 2,67,320 TPA (ROM) in the name of Sh. Jaichand Lal Daga S/o Late Sh. Champa Lal Daga is a proposed mining project in Inda Ka Bala, Kolayat, Bikaner, Rajasthan. The site covers 9.9 acres.

Who is building it?

The applicant is Jai Chandlal Daga.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Feb 2026), as of 27 Nov 2026.

Where is it?

In Inda Ka Bala, Kolayat, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹2.4 crore and a site of 9.9 acres.

When was it filed?

The application was filed on 5 Feb 2026.

Project details

StatusCleared for impact study
Status since5 Feb 2026
Application filed5 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJai Chandlal Daga
Land area9.9 acres (4 ha)
Project cost₹2.4 crore
Village / localityInda Ka Bala
Taluk / tehsilKolayat
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33578

In context

516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is smaller than 56% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 29.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 53 mining leases have applied within 5 km.

Where it is

Inda Ka Bala, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jai Chandlal Daga in Bikaner

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.