Quick answers
What is this project?
Daruda Masonry Stone Mining Project, Plot No. 76, KHASRA NO. 399/299 Plot area – 2.0 Hect. Near Village Daruda Tehsil & District Barmer Rajasthan in favor of Jai ma Santoshi stone crushing company Proprietor Bayraj Kanwar W/o Sh . Madan Singh is a lapsed mining project in Darura, Barmer, Rajasthan. The site covers 4.9 acres.
Who is building it?
The applicant is Bairaj Kanwar.
Has it been approved?
No. The application was lapsed on 16 Oct 2026, so it is no longer under consideration.
Where is it?
In Darura, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bairaj Kanwar |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Darura |
| Taluk / tehsil | Barmer |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33655 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 4.9 acres, this one is larger than 63% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 27.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 44 mining leases have applied within 5 km.
Where it is
Darura, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — lapsed, 100 m away
- Daruda Masonry Stone Mining Project, Plot No. 75, Proposed Production –… — cleared for impact study, 100 m away
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — cleared for impact study, 100 m away
- Daruda Masonry Stone Mining Project, Plot No. 73 Favor of Shri Arjun Singh,… — lapsed, 250 m away
- Daruda Masonry Stone Mining Project, Plot No. 73 Favor of Shri Arjun Singh,… — cleared for impact study, 250 m away
- Cluster Daruda Masonry Stone Mining Project, Plot. No.72, Proposed Production… — cleared for impact study, 300 m away
- "Daruda" Cluster Masonry Stone Mining Project, Near Village Daruda Tehsil &… — under environmental review, 450 m away
- Proposed Daruda Masonry stone (Minor Mineral) Mining Project in cluster, Plot… — more information requested, 550 m away
More from Bairaj Kanwar in Barmer
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — lapsed
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted
- Cluster Daruda Masonry Stone Mining Project, Plot. No.72, Proposed Production… — cleared for impact study
- Daruda Masonry Stone Mining Project, Plot No. 75, Proposed Production –… — cleared for impact study
- Daruda Masonry Stone Mining Project, Plot No. 75 Favor of M/s Maa Santoshi… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.