What is Developing? Open the mapMap

Cleared for impact studyMining · Bundi, Rajasthan

M/s Adinath Construction, Sand Stone & Khanda (Masonary Stone) Mining Project, (Plot No.255), Lease Area- 2.00 Hect., Cluster Area- 75.3363 Hect., Proposed Production Capacity-392057 TPA (ROM) {Saleable (Sand Stone) Mineral: 24532 TPA + Saleable (Khanda-Masonary Stone) Mineral: 182256 TPA + Soil: 3738 TPA + Waste/OB: 181531 TPA}, Near Village- Parana, Tehsil- Talera, District- Bundi and State- Rajasthan

M/s Adinath Construction, Sand Stone & Khanda (Masonary Stone) Mining Project, (Plot No.255), Lease Area- 2.00 Hect., Cluster Area- 75.3363 Hect., Proposed Production Capacity-392057 TPA (ROM) {Saleable (Sand Stone) Mineral: 24532 TPA + Saleable (Khanda-Masonary Stone) Mineral: 182256 TPA + Soil: 3738 TPA + Waste/OB: 181531 TPA}, Near Village- Parana, Tehsil- Talera, District- Bundi and State- Rajasthan is a proposed mining project in Parana, Talera, Bundi, Rajasthan. The site covers 4.9 acres. Its stated project cost is ₹3.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Apr 2026).

See it on the live map All projects in Bundi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since9 Apr 2026
Application filed30 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRohit Jain
Land area4.9 acres (2 ha)
Project cost₹3.5 crore
Village / localityParana
Taluk / tehsilTalera
DistrictBundi
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33656

In context

865 applications in Bundi since January 2022 are in the same category (Mining): 460 approved, 104 filed or under review, and 301 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 64% of them.

15 other mining leases have applied within 500 m of this site; together with this one they cover 75.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 300 mining leases have applied within 5 km.

Where it is

Parana, Talera, Bundi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rohit Jain in Bundi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.