One of 2 filings for this project. The project's main page, with every filing and where each stands: Sarasani Harima Somna Limestone Block HPB 20 (ML Area: 547.5512 ha) with Proposed…
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ambuja Cements Limited |
| Land area | 1,353 acres (547.6 ha) |
| Project cost | ₹469 crore |
| Village / locality | Harima |
| Taluk / tehsil | Nagaur |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33792 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jul 2026 (this page) | Lapsed | 1,353 acres | ₹469 crore |
| Early planning filed 24 Aug 2024 | Cleared for impact study | 1,353 acres | ₹469 crore |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,353 acres, this one is larger than 99% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 1,364.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 46 mining leases have applied within 5 km.
Where it is
Harima, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sarasani Harima Somna Limestone Block HPB 20 (ML Area: 547.5512 ha) with… — cleared for impact study, 0 m away
- Proposed PSB 12 Limestone Block (Auctioned Block) (Area: 4.8062 ha) with… — environmental approval granted, 450 m away
- Proposed PSB 12 Limestone Block (Auctioned Block) (Area: 4.8062 ha) with… — cleared for impact study, 450 m away
- Proposed PSB 11 Limestone Block (Auctioned Block) (Area: 4.8044 ha) with… — environmental approval granted, 650 m away
- Proposed PSB 11 Limestone Block (Auctioned Block) (Area: 4.8044 ha) with… — cleared for impact study, 650 m away
- HPB19 Limestone Block (ML Area: 476.8022 ha.) with Limestone Production… — under environmental review, 1.2 km away
- HPB19 Limestone Block (ML Area: 476.8022 ha.) with Limestone Production… — cleared for impact study, 1.2 km away
- Proposed Harima Limestone Block PSB07 (Auctioned Block) (Area 4.80 ha) with… — environmental approval granted, 1.9 km away
More from Ambuja Cements Limited in Nagaur
- Proposed PSB 12 Limestone Block (Auctioned Block) (Area: 4.8062 ha) with… — environmental approval granted
- Proposed PSB 11 Limestone Block (Auctioned Block) (Area: 4.8044 ha) with… — environmental approval granted
- Proposed Harima Limestone Block PSB06 (Auctioned Block) (Area 4.80 ha) with… — environmental approval granted
- Proposed Harima Limestone Block PSB07 (Auctioned Block) (Area 4.80 ha) with… — environmental approval granted
- Proposed Harima Limestone Block PSB02 (Auctioned Block) (Area 4.8122 ha) with… — environmental approval granted
- Proposed Harima Limestone Block PSB01 (Auctioned Block) (Area 4.8122 ha) with… — environmental approval granted
21 Ambuja Cements projects in Nagaur
All 87 Ambuja Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.