What is Developing? Open the mapMap

LapsedMining · Barmer, Rajasthan

Proposed Masonry Stone Mining Project; Plot No.140,Area: 1.50 Hect., Near Village- Hariyala Magra, Tehsil – Barmer, District -Barmer (Raj.) in favor of Shri Navala Ram S/o. Shri Kana Ram

Proposed Masonry Stone Mining Project; Plot No.140,Area: 1.50 Hect., Near Village- Hariyala Magra, Tehsil – Barmer, District -Barmer (Raj.) in favor of Shri Navala Ram S/o. Shri Kana Ram is a lapsed mining project in Sejuon Ki Dhani, Barmer, Rajasthan. The site covers 3.7 acres. Its stated project cost is ₹1.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 9 Sept 2026).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Masonry Stone Mining Project; Plot No.140,Area: 1.50 Hect., Near Village- Hariyala Magra, Tehsil – Barmer, District -Barmer (Raj.) in favor of Shri Navala Ram S/o. Shri Kana Ram is a lapsed mining project in Sejuon Ki Dhani, Barmer, Rajasthan. The site covers 3.7 acres.

Who is building it?

The applicant is Navala Ram.

Has it been approved?

No. The application was lapsed on 9 Sept 2026, so it is no longer under consideration.

Where is it?

In Sejuon Ki Dhani, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹1.6 crore and a site of 3.7 acres.

When was it filed?

The application was filed on 18 Mar 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Masonry Stone Mining Project; Plot No.140,Area: 1.50 Hect., Near Village-…

Project details

StatusLapsed
Status since9 Sept 2026
Application filed18 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantNavala Ram
Land area3.7 acres (1.5 ha)
Project cost₹1.6 crore
Village / localitySejuon Ki Dhani
Taluk / tehsilBarmer
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33999

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 7 Sept 2026Under environmental review3.7 acres₹1.6 crore
Early planning filed 18 Mar 2026 (this page)Lapsed3.7 acres₹1.6 crore
Early planning filed 23 Feb 2024Cleared for impact study3.7 acres₹1.6 crore

In context

878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.7 acres, this one is larger than 56% of them.

11 other mining leases have applied within 500 m of this site; together with this one they cover 38.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Sejuon Ki Dhani, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.