Deora Granite Mining Project ML No.308/2002, Near Village-Deora, Tehsil-Samdari, District-Balotra, State-Rajasthan, Area-3.0 Ha., Annual Production-22,770 TPA, Applicant-Nagnechi Kripa Minerals is a lapsed mining project in Devra, Samdari, Barmer, Rajasthan. The site covers 7.4 acres.
Who is building it?
The applicant is Chandra Kanwar.
Has it been approved?
No. The application was lapsed on 22 Jan 2026, so it is no longer under consideration.
Where is it?
In Devra, Samdari, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 22 Jan 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Jan 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Chandra Kanwar |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹2 crore |
| Village / locality | Devra |
| Taluk / tehsil | Samdari |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34272 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 7.4 acres, this one is larger than 79% of them.
19 other mining leases have applied within 500 m of this site; together with this one they cover 145.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 47 mining leases have applied within 5 km.
Where it is
Devra, Samdari, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Appraisal of EC Granted from DEIAA, Barmer For Existing Granite Mining… — environmental approval granted, 0 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Barmer of our… — lapsed, 200 m away
- Existing Granite Mining Project M.L. No. 148/07 Area-2.482 Ha, Near… — more information requested, 300 m away
- Existing "Granite (Minor Mineral) mining project" M.L.No.- 221/2004 and Khasra… — more information requested, 300 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Barmer [Rajasthan]… — environmental approval granted, 300 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Barmer [Rajasthan]… — environmental approval granted, 350 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Barmer [Rajasthan]… — lapsed, 350 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — lapsed, 350 m away
More from Chandra Kanwar in Barmer
- Re Appraisal of EC Granted from DEIAA, Barmer For Existing Granite Mining… — environmental approval granted
About this information