Quick answers
What is this project?
Bajri Mining Project, Plot No. 08/2025 having mine lease area 37.5514 hectare Located Near Village: Dhoolkot, Tehsil-Raipur, District-Beawar, State - (Rajasthan) with proposed production capacity: 2,53,471.98 TPA (ROM) in the name of Shri Nitin Mishra S/o Late Shri Ram Sevak Mishra is a proposed mining project in Dhulkot, Raipur, Pali, Rajasthan. The site covers 92.8 acres.
Who is building it?
The applicant is Nitin Mishra.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Sept 2026), as of 27 Nov 2026.
Where is it?
In Dhulkot, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 92.8 acres.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Nitin Mishra |
| Land area | 92.8 acres (37.6 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Dhulkot |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34421 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 17 Jul 2026 (this page) | Cleared for impact study | 92.8 acres | ₹1.3 crore |
| Early planning filed 27 Oct 2025 | Cleared for impact study | 92.8 acres | ₹1.3 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 92.8 acres, this one is larger than 90% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dhulkot, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bajri Mining Project, Plot No. 08/2025 having mine lease area 37.5514 hectare… — cleared for impact study, 0 m away
- Change in Product Mix in Existing Pesticide Manufacturing Unit "Without… — initial checks, 3.1 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. 01, Lease area-100 ha.)… — returned to applicant, 4.1 km away
- Proposed River Sand (Bajri) Mining Project (Plot No. 01, Lease area-100 ha.)… — environmental approval granted, 4.1 km away
- Mesiya River Sand Mining Project (Plot No. 01, Lease area-100 ha.) At Khasra… — cleared for impact study, 4.1 km away
- Re-Appraisal of Masonry Stone Mining project ML. NO.-116/2009, Area-1.00 Ha,… — environmental approval granted, 4.3 km away
- Re-Appraisal of Masonry Stone Mining project ML. NO.-118/2009, Area-1.00 Ha,… — environmental approval granted, 4.3 km away
- Mesiya River Sand Mining Project (Plot No. 01, Lease area-100 ha.) At Khasra… — lapsed, 4.3 km away
More from Nitin Mishra in Pali
- "Bajri Mining Project, Delineated Plot No. 47" having mine lease area of… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.