Quick answers
What is this project?
Borunda Limestone Mine (Minor Mineral) (M.L. No. 134/1996) over an area 4.9998 Ha. with ROM Limestone Production Capacity 70,000 TPA located Village Borunda, Tehsil Bilara, District: Jodhpur, Rajasthan of M/s UltraTech Cement Limited is a lapsed mining project in Boroonda, Pipar Shahar, Jodhpur, Rajasthan. The site covers 12.4 acres.
Who is building it?
The applicant is UltraTech Cement Limited.
Has it been approved?
No. The application was lapsed on 13 May 2026, so it is no longer under consideration.
Where is it?
In Boroonda, Pipar Shahar, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹20 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 23 Jan 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 May 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Boroonda |
| Taluk / tehsil | Pipar Shahar |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34674 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 12.4 acres, this one is larger than 99% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 22.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 26 mining leases have applied within 5 km.
Where it is
Boroonda, Pipar Shahar, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Appraisal of the Lime Stone mining project ML. No.-11/2012, Area-4.00 Ha,… — lapsed, 350 m away
- Regarding Transfer / Name Change in the Environment Clearance Letter of… — environmental approval granted, 1.6 km away
- Regarding Transfer of EC of our Existing Lime Stone (Minor Mineral) Mining… — environmental approval granted, 1.6 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur (Raj.) Vide Letter No.… — environmental approval granted, 1.8 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur (Raj.) Vide Letter… — environmental approval granted, 2.3 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur (Raj.) Vide Letter No.… — environmental approval granted, 2.5 km away
- Re-appraisal of Environment Clearance granted by DEIAA to SEIAA in compliance… — environmental approval granted, 2.8 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur. Vide Letter… — environmental approval granted, 2.8 km away
More from UltraTech Cement Limited in Jodhpur
- Regarding Transfer / Name Change in the Environment Clearance Letter of… — environmental approval granted
3 UltraTech Cement projects in Jodhpur
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.