Quick answers
What is this project?
Existing Sandstone Mining Project; (Non-Operational) Q.L. No.- 125, Area: 0.27 Hect. Near Village- Barwadia Nada, Tehsil & District- Jodhpur (Raj.) in favor of Shri Tila Ram S/o Shri Navala Ram is an approved mining project in Keru, Jodhpur, Rajasthan. The site covers 0.3 acres.
Who is building it?
The applicant is Tila Ram Gehlot.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Oct 2026), as of 27 Nov 2026.
Where is it?
In Keru, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹40 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 19 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Oct 2026 |
| Application filed | 19 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tila Ram Gehlot |
| Land area | 1,200 m² |
| Project cost | ₹40 lakh |
| Village / locality | Keru |
| Taluk / tehsil | Jodhpur |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34692 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Jun 2026 (this page) | Environmental approval granted | 0.3 acres | ₹40 lakh |
| Early planning filed 6 Feb 2026 | Cleared for impact study | 0.3 acres | ₹40 lakh |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.3 acres, this one is smaller than 98% of them.
99 other mining leases have applied within 500 m of this site; together with this one they cover 129.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3,172 mining leases have applied within 5 km.
Where it is
Keru, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Sandstone Mining Project; (Non-Operational) Q.L. No.- 125, Area: 0.27… — cleared for impact study, 0 m away
- Existing Sandstone Mining Project; (Non-Operational) Q.L. No.- 126, Area: 0.27… — environmental approval granted, 0 m away
- Existing Sandstone Mining Project; (Non-Operational) Q.L. No.- 126, Area: 0.27… — cleared for impact study, 0 m away
- SH. Hukma Ram S/O Mangi Lal Ql No 127 Barwadiya Nada — environmental approval granted, 50 m away
- Existing Sandstone Mining Project, Area- 0.1800 ha., Q.L. No.- 123, Near… — lapsed, 100 m away
- Existing Sandstone (Non-Operational) Mining Project, Q.L. No.- 128, Area-… — environmental approval granted, 100 m away
- This is a Fresh proposal for Existing Mining Project "Sandstone (minor… — lapsed, 100 m away
- Existing Sandstone Mining Project; Q.L. No.- 122, Area: 0.27 Hect. Near… — environmental approval granted, 100 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.