What is Developing? Open the mapMap

Environmental approval grantedMining · Jhunjhunun, Rajasthan

This is an Existing "Granite (Minor Mineral) Mining Project" [M.L. No. 2577/12] over an area of 3.0 Hectare with Proposed Expansion in Production Capacity from 44,300 TPA to 7,04,700 TPA(ROM) {Recoverable mineral – 6,34,230 TPA (90% as masonry use & 10% as blocks) and Granite –70,470 TPA} Located Near Village– Hukumpura Balmas, Tehsil- Udaipurwati, District - Jhunjhunu (Rajasthan) proposed by M/s Balaji S.K.T.

This is an Existing "Granite (Minor Mineral) Mining Project" [M.L. No. 2577/12] over an area of 3.0 Hectare with Proposed Expansion in Production Capacity from 44,300 TPA to 7,04,700 TPA(ROM) {Recoverable mineral – 6,34,230 TPA (90% as masonry use & 10% as blocks) and Granite –70,470 TPA} Located Near Village– Hukumpura Balmas, Tehsil- Udaipurwati, District - Jhunjhunu (Rajasthan) proposed by M/s Balaji S.K.T is an approved mining project in Hukampura, Udaipurwati, Jhunjhunun, Rajasthan. The site covers 7.4 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Nov 2026).

See it on the live map All projects in Jhunjhunun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since19 Nov 2026
Application filed6 May 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantBalaji Skt
Land area7.4 acres (3 ha)
Project cost₹2 crore
Village / localityHukampura
Taluk / tehsilUdaipurwati
DistrictJhunjhunun
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35234

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 6 May 2026 (this page)Environmental approval granted7.4 acres₹2 crore
Early planning filed 18 Dec 2023Cleared for impact study7.4 acres₹2 crore

In context

478 applications in Jhunjhunun since January 2022 are in the same category (Mining): 270 approved, 30 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is larger than 84% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 42 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 30 mining leases have applied within 5 km.

Where it is

Hukampura, Udaipurwati, Jhunjhunun, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Balaji Skt in Jhunjhunun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.