What is Developing? Open the mapMap

Under environmental reviewMining · Churu, Rajasthan

Masonry stone (M-Sand) & Gravel (Minor Mineral) Cluster Mining Project for "Cluster No- 03", Total cluster area – 23.5604 Hectare with Proposed Total Cluster Production Capacity– 3389044.5 TPA (ROM) [{Saleable Mineral 3222832.475 TPA & Waste-166212.025 TPA}, {Top soil- 1207960.5}]

Masonry stone (M-Sand) & Gravel (Minor Mineral) Cluster Mining Project for "Cluster No- 03", Total cluster area – 23.5604 Hectare with Proposed Total Cluster Production Capacity– 3389044.5 TPA (ROM) [{Saleable Mineral 3222832.475 TPA & Waste-166212.025 TPA}, {Top soil- 1207960.5}] is a proposed mining project in Balera, Bidasar, Churu, Rajasthan. The site covers 58.2 acres. Its stated project cost is ₹15 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 5 Aug 2026).

See it on the live map All projects in Churu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleMasonry stone (M-Sand) & Gravel (Minor Mineral) Cluster Mining Project for "Cluster No- 03", Total cluster area – 23.5604 Hectare with Proposed Total Cluster Production Capacity– 3389044.5 TPA (ROM) [{Saleable Mineral 3222832.475 TPA & Waste-166212.025 TPA}, {Top soil- 1207960.5}] at located Near Village- Balera & Dungrass Athuna & Chadwas, Tehsil- Bidasar, District- Churu, Rajasthan proposed by Assistant Mining Engineer, Churu, Department of Mines & Geology, Govt. of Rajasthan
StatusUnder environmental review
Status since5 Aug 2026
Application filed8 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantNorang Lal Meghwal
Land area58.2 acres (23.6 ha)
Project cost₹15 crore
Village / localityBalera
Taluk / tehsilBidasar
DistrictChuru
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35279

In context

221 applications in Churu since January 2022 are in the same category (Mining): 119 approved, 10 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 58.2 acres, this one is larger than 100% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 60.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 38 mining leases have applied within 5 km.

Where it is

Balera, Bidasar, Churu, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.