Quick answers
What is this project?
Integrated Cement Plant - Clinker: 2.4 Million TPA; Cement: 4.0 Million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement); CPP: 20 MW; WHRS: 15 MW; Synthetic Gypsum: 1560 TPD (65 TPH) and DG Sets: 2500 KVA (1 x 2500 KVA or 2 x 1000 KVA & 1 x 500 KVA or 1 x 1000 KVA, 2 x 500 KVA & 2 x 250 KVA) is a lapsed industrial project in Sanu, Jaisalmer, Rajasthan. The site covers 3,383.5 acres.
Who is building it?
The applicant is Shree Cement Limited.
Has it been approved?
No. The application was lapsed on 28 Jul 2026, so it is no longer under consideration.
Where is it?
In Sanu, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹3,076 crore and a site of 3,383.5 acres.
When was it filed?
The application was filed on 28 Jul 2026.
Project details
| Official title | Integrated Cement Plant - Clinker: 2.4 Million TPA; Cement: 4.0 Million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement); CPP: 20 MW; WHRS: 15 MW; Synthetic Gypsum: 1560 TPD (65 TPH) and DG Sets: 2500 KVA (1 x 2500 KVA or 2 x 1000 KVA & 1 x 500 KVA or 1 x 1000 KVA, 2 x 500 KVA & 2 x 250 KVA) along with Railway siding at Village: Sonu, Tehsil: Ramgarh, District: Jaisalmer (Rajasthan) by Shree Cement Limited (Unit: Golden Fort Cement Plant) |
|---|---|
| Status | Lapsed |
| Status since | 28 Jul 2026 |
| Application filed | 28 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shree Cement Limited |
| Land area | 3,383.5 acres (1,369.2 ha) |
| Project cost | ₹3,076 crore |
| Village / locality | Sanu |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-35327 |
In context
9 applications in Jaisalmer since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanu, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Parewar SN-IV Limestone Block (960 Ha.)" with proposed Limestone… — under environmental review, 2.8 km away
- Parewar SN-III Limestone Block (Area: 928.00 ha) with Proposed Limestone… — lapsed, 3 km away
- Integrated Cement Plant with production capacity of Clinker-8.0 Million TPA… — lapsed, 5.6 km away
- Proposed Integrated Cement Project: Clinker - 8.0 Million TPA (2 x 4.0 Million… — environmental approval granted, 6.4 km away
- Parewar SN-V Limestone Mine (ML No. 23/2011 & ML Area: 912 ha) with Limestone… — cleared for impact study, 6.7 km away
- Parewar SN-V Limestone Mine (ML No. 23/2011 & ML Area: 912 ha) with Limestone… — returned to applicant, 6.7 km away
- Proposed Parewar SN1 Limestone Block (Area- 960 Ha.) with Total Excavation… — environmental approval granted, 6.9 km away
- Proposed Parewar SN1 Limestone Block (Area- 960 Ha.) with Total Excavation… — under environmental review, 6.9 km away
More from Shree Cement Limited in Jaisalmer
- Parewar SN-V Limestone Mine (ML No. 23/2011 & ML Area: 912 ha) with Limestone… — cleared for impact study
- Parewar SN-V Limestone Mine (ML No. 23/2011 & ML Area: 912 ha) with Limestone… — returned to applicant
3 Shree Cement projects in Jaisalmer
All 63 Shree Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.