Quick answers
What is this project?
Proposed Marble & Dolomite Mining Project, Plot No.- 265 (M.L. No. 16/2025), Area:-1.0Hect., Near Village- Kanwalai, Tehsil-Pushkar, District- Ajmer (Raj.) in favor of Shri Balwant Singh S/o Shri Udaipal Singh is a lapsed mining project in Kanwalai, Pushkar, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Balwant Singh.
Has it been approved?
No. The application was lapsed on 25 Nov 2026, so it is no longer under consideration.
Where is it?
In Kanwalai, Pushkar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹95 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 18 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 18 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Balwant Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Kanwalai |
| Taluk / tehsil | Pushkar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-35334 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 150 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Kanwalai, Pushkar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Marble & Dolomite Mining Project, Plot No.- 264 (M.L. No. 15/2025),… — cleared for impact study, 200 m away
- Mining of Masonry Stone (Minor Mineral) Mining Project Cluster No.- 85 with… — environmental approval granted, 200 m away
- Mining of Masonry Stone (Minor Mineral) Mining Project Cluster No.- 85 with… — cleared for impact study, 200 m away
- Proposed Marble & Dolomite Mining Project, Plot No.- 266 (M.L. No. 17/2025),… — cleared for impact study, 250 m away
- Marble and Dolomite Mining Project, Area- 2.00 Hectare, Plot no.-254, M.L… — under environmental review, 250 m away
- Proposed Marble & Dolomite Mining Project, Plot No.- 255 (M.L. No. 14/2025),… — cleared for impact study, 300 m away
- Proposed Masonry Stone Cluster Mining Project (Pre-embedded Clearance),… — environmental approval granted, 300 m away
- Proposed Marble & Dolomite Mining Project, Plot No.- 235 (M.L. No. 07/2025),… — cleared for impact study, 350 m away
More from Balwant Singh in Ajmer
- Proposed Granite Mining Project, M.L.No.- 18/2025 (Deli. Plot No.- 285), Area:… — under environmental review
- Proposed Marble & Dolomite Mining Project, Plot No.- 249 (M.L. No. 08/2025),… — under environmental review
- Proposed Marble & Dolomite Mining Project, Plot No.- 264 (M.L. No. 15/2025),… — cleared for impact study
- Proposed Granite Mining Project, M.L.No.- 29/2025 (Deli. Plot No.- 270), Area:… — cleared for impact study
- Proposed Granite Mining Project, M.L.No.- 33/2025 (Deli. Plot No.- 271), Area:… — cleared for impact study
- Proposed Granite Mining Project, M.L.No.- 31/2025 (Deli. Plot No.- 272), Area:… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.