Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 18 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Dr Oetker India Private Limited |
| Use | Industrial |
| Parking spaces | 130 |
| Land area | 14 acres (5.7 ha) |
| Built-up area | 19,566 m² (2,10,606 sq ft) |
| Plot area | 56,656 m² (6,09,840 sq ft) |
| Project cost | ₹311.4 crore |
| Village / locality | Kharani |
| Taluk / tehsil | Tijara |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-35337 |
In context
114 applications in Alwar since January 2022 are in the same category (Buildings & townships): 44 approved, 46 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 14 acres, this one is larger than 52% of them.
55 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharani, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Shed of M/s Relaxo Footwears Limited (Unit-II) located at Plot Nos.… — environmental approval granted, 300 m away
- Industrial Shed Project of Skipper Seil Limited — environmental approval granted, 850 m away
- Environment clearance for an Industrial shed project over a land measuring… — more information requested, 950 m away
- Shree Balaji Rolling Mills-"Regularization of the existing Rolling Mill having… — environmental approval granted, 1.3 km away
- Shree Balaji Rolling Mills-"Regularization of the existing Rolling Mill having… — lapsed, 1.3 km away
- Expansion in production capacity of existing thermosetting Moulding Powder… — cleared for impact study, 1.6 km away
- Expansion in production capacity of existing thermosetting Moulding Powder… — cleared for impact study, 1.6 km away
- Expansion of Rubber Chemicals Manufacturing Plant from 1,075 TPA to 15,475… — under environmental review, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.