What is Developing? Open the mapMap

Environmental approval grantedMining · Sawai Madhopur, Rajasthan

This is a Fresh Proposal for "Masonry Stone (Minor Mineral) Mining Project" [Plot No.-07] over an Area of 1.50 Hectares by M/s Bhairav Constructions

This is a Fresh Proposal for "Masonry Stone (Minor Mineral) Mining Project" [Plot No.-07] over an Area of 1.50 Hectares by M/s Bhairav Constructions is an approved mining project in Chhakra, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 3.7 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Oct 2026).

See it on the live map All projects in Sawai Madhopur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

This is a Fresh Proposal for "Masonry Stone (Minor Mineral) Mining Project" [Plot No.-07] over an Area of 1.50 Hectares by M/s Bhairav Constructions is an approved mining project in Chhakra, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 3.7 acres.

Who is building it?

The applicant is Kuldeep Singh Jadoun.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Oct 2026), as of 27 Nov 2026.

Where is it?

In Chhakra, Wazeerpur, Sawai Madhopur, Rajasthan.

How big is it?

It has a stated cost of ₹1 crore and a site of 3.7 acres.

When was it filed?

The application was filed on 25 Apr 2026.

Project details

Official titleThis is a Fresh Proposal for "Masonry Stone (Minor Mineral) Mining Project" [Plot No.-07] over an Area of 1.50 Hectares, located at Near Village–Chhakra, Tehsil-Wazirpur & District-Sawai Madhopur (Rajasthan) with Proposed Production Capacity–165000 TPA (ROM) {Saleable Masonry Stone-132000 TPA, Waste-33000 TPA} by M/s Bhairav Constructions.
StatusEnvironmental approval granted
Status since17 Oct 2026
Application filed25 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKuldeep Singh Jadoun
Land area3.7 acres (1.5 ha)
Project cost₹1 crore
Village / localityChhakra
Taluk / tehsilWazeerpur
DistrictSawai Madhopur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35411

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Apr 2026 (this page)Environmental approval granted3.7 acres₹1 crore
Early planning filed 28 Apr 2025Cleared for impact study3.7 acres₹1 crore

In context

235 applications in Sawai Madhopur since January 2022 are in the same category (Mining): 97 approved, 46 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.7 acres, this one is larger than 69% of them.

24 other mining leases have applied within 500 m of this site; together with this one they cover 239 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 77 mining leases have applied within 5 km.

Where it is

Chhakra, Wazeerpur, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.