Forest land use approvedPower · Barmer, Rajasthan

400 kV D/C twin (HLTS*) Transmission Line from Fatehgarh-4 -Fatehgarh -3 Line by Fatehgarh-IV Transmission Limited

400 kV D/C twin (HLTS*) Transmission Line from Fatehgarh-4 -Fatehgarh -3 Line by Fatehgarh-IV Transmission Limited is an approved power project in Gunga, Sheo, Barmer, Rajasthan. The site covers 1,808.4 acres. Its stated project cost is ₹70 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 11 Sept 2025).

See it on the live map All projects in Barmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

400 kV D/C twin (HLTS*) Transmission Line from Fatehgarh-4 -Fatehgarh -3 Line by Fatehgarh-IV Transmission Limited is an approved power project in Gunga, Sheo, Barmer, Rajasthan. The site covers 1,808.4 acres.

Who is building it?

The applicant is Fatehgarh IV Transmission Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 11 Sept 2025), as of 27 Nov 2026.

Where is it?

In Gunga, Sheo, Barmer, Rajasthan.

How big is it?

It has a stated cost of ₹70 crore; a site of 1,808.4 acres and 4 acres (1.6 ha) of forest land.

When was it filed?

The application was filed on 29 Sept 2024.

Project details

Official titleConstruction of 400 kV D/C twin (HLTS*) Transmission Line from Fatehgarh-4 -Fatehgarh -3 Line under the Transmission Scheme for evacuation of REZ in Rajasthan (20 GW) under Phase-III Part-A1 by Fatehgarh-IV Transmission Limited
StatusForest land use approved
Status since11 Sept 2025
Application filed29 Sept 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantFatehgarh IV Transmission Limited
Land area1,808.4 acres (731.8 ha)
Forest land4 acres (1.6 ha)
Project cost₹70 crore
Village / localityGunga
Taluk / tehsilSheo
DistrictBarmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35773

In context

24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 1,808.4 acres, this one is larger than 70% of them.

Where it is

Gunga, Sheo, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.