"Work of EMI at existing Intake well at Chambal River, Raw Water pipeline from Intake to RWR-1 and RWR-2 at Dholpur, Main Raw Water Pumping Stations at RWR-1 & RWR-2, Water Treatment Plant 135 MLD Near RWR-02& 5.0 MLD at Dholpur, Cluster Pumping Station, Treatment Plant 5.0 MLD at Dholpur, Cluster Pumping Station, CDS, VDS, and Rising Mains & FHTC for Dholpur & Saipau Block including allied works . " UNDER JJM

"Work of EMI at existing Intake well at Chambal River, Raw Water pipeline from Intake to RWR-1 and RWR-2 at Dholpur, Main Raw Water Pumping Stations at RWR-1 & RWR-2, Water Treatment Plant 135 MLD Near RWR-02& 5.0 MLD at Dholpur, Cluster Pumping Station, Treatment Plant 5.0 MLD at Dholpur, Cluster Pumping Station, CDS, VDS, and Rising Mains & FHTC for Dholpur & Saipau Block including allied works . " UNDER JJM is a proposed pipeline project in Adhapur, Bharatpur, Rajasthan. The site covers 829.5 acres. Its stated project cost is ₹3,106 crore. As of 27 Nov 2026, its status is “More information requested” (since 27 Oct 2026).

See it on the live map All projects in Bharatpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Work of EMI at existing Intake well at Chambal River, Raw Water pipeline from Intake to RWR-1 and RWR-2 at Dholpur, Main Raw Water Pumping Stations at RWR-1 & RWR-2, Water Treatment Plant 135 MLD Near RWR-02& 5.0 MLD at Dholpur, Cluster Pumping Station, Treatment Plant 5.0 MLD at Dholpur, Cluster Pumping Station, CDS, VDS, and Rising Mains & FHTC for Dholpur & Saipau Block including allied works . " UNDER JJM is a proposed pipeline project in Adhapur, Bharatpur, Rajasthan. The site covers 829.5 acres.

Who is building it?

The applicant is Public Health Engineering Department.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Adhapur, Bharatpur, Rajasthan.

How big is it?

It has a stated cost of ₹3,106 crore; a site of 829.5 acres and 7.9 acres (3.2 ha) of forest land.

When was it filed?

The application was filed on 15 Sept 2026.

Project details

StatusMore information requested
Status since27 Oct 2026
Application filed15 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantPublic Health Engineering Department
Land area829.5 acres (335.7 ha)
Forest land7.9 acres (3.2 ha)
Project cost₹3,106 crore
Village / localityAdhapur
Taluk / tehsilBharatpur
DistrictBharatpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35856

Where it is

Adhapur, Bharatpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 52 Public Health Engineering Department, Rajasthan projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.