Forest land use approvedPower · Bikaner, Rajasthan

132 KV S/C Transmission Line from Loonkaransar 132 KV GSS to 50MW Solar Park Loonkaransar District-Bikaner (Rajasthan)

132 KV S/C Transmission Line from Loonkaransar 132 KV GSS to 50MW Solar Park Loonkaransar District-Bikaner (Rajasthan) is an approved power project in Jakharwala, Lunkaransar, Bikaner, Rajasthan. The site covers 272.8 acres. Its stated project cost is ₹6.5 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 4 Mar 2026).

See it on the live map All projects in Bikaner

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

132 KV S/C Transmission Line from Loonkaransar 132 KV GSS to 50MW Solar Park Loonkaransar District-Bikaner (Rajasthan) is an approved power project in Jakharwala, Lunkaransar, Bikaner, Rajasthan. The site covers 272.8 acres.

Who is building it?

The applicant is Rays Power Experts Private Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 4 Mar 2026), as of 27 Nov 2026.

Where is it?

In Jakharwala, Lunkaransar, Bikaner, Rajasthan.

How big is it?

It has a stated cost of ₹6.5 crore; a site of 272.8 acres and 650 m² of forest land.

When was it filed?

The application was filed on 15 Nov 2025.

Project details

Official titleConstruction of 132 KV S/C Transmission Line from Loonkaransar 132 KV GSS to 50MW Solar Park Loonkaransar District-Bikaner (Rajasthan)
StatusForest land use approved
Status since4 Mar 2026
Application filed15 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantRays Power Experts Private Limited
Land area272.8 acres (110.4 ha)
Forest land650 m²
Project cost₹6.5 crore
Village / localityJakharwala
Taluk / tehsilLunkaransar
DistrictBikaner
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35963

In context

20 applications in Bikaner since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 272.8 acres, this one is smaller than 78% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jakharwala, Lunkaransar, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Rays Power Experts projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.