Quick answers
What is this project?
Laying of Pipe Line Water Supply Project of 648 villages in Block Begun Bhainsorgarh, Gangarar, Chittorgarh, Bhadesar & Nimbahera District-Chittorgarh From Chambal River under Jal-Jeevan Mission (Package-1) is a proposed water and irrigation project in Hajipura, Rawatbhata, Chittaurgarh, Rajasthan. The site covers 7,894.1 acres.
Who is building it?
The applicant is Public Health Engineering Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Hajipura, Rawatbhata, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹931.1 crore; a site of 7,894.1 acres and 31.2 acres (12.6 ha) of forest land.
When was it filed?
The application was filed on 23 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Pipe Line Water Supply Project of 648 villages in Block Begun Bhainsorgarh,…
Project details
| Status | More information requested |
|---|---|
| Status since | 28 Jul 2025 |
| Application filed | 23 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Public Health Engineering Department |
| Land area | 7,894.1 acres (3,194.6 ha) |
| Forest land | 31.2 acres (12.6 ha) |
| Project cost | ₹931.1 crore |
| Village / locality | Hajipura |
| Taluk / tehsil | Rawatbhata |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36021 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Sept 2024 | Forest land use approved | ₹931.1 crore | |
| New project filed 23 Jan 2024 (this page) | More information requested | 7,894.1 acres | ₹931.1 crore |
In context
7 applications in Chittaurgarh since January 2022 are in the same category (Water & irrigation): 5 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Hajipura, Rawatbhata, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Pipe Line Water Supply Project of 648 villages in Block Begun… — decision issued, 0 m away
- Laying of Pipe Line Water Supply Project of 648 villages in Block Begun… — forest land use approved, 5.7 km away
- Re-Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within… — lapsed, 8.2 km away
- Preliminary Exploration (G-3) for Limestone in Southeast Of Shambhunath Ji Ka… — more information requested, 9.7 km away
- Tal-Kojya Road (Parlai) to Dungarpur, Timriya — lapsed, 11.3 km away
- SUKHPURA OFF-STREAM CLOSED LOOP PUMPED STORAGE PROJECT (OCPSP) -2560 MW by M/s… — environmental approval granted, 11.7 km away
- SUKHPURA OFF-STREAM CLOSED LOOP PUMPED STORAGE PROJECT (OCPSP) -2560 MW by M/s… — cleared for impact study, 11.7 km away
- Sukhpura Off-Stream Closed-Loop Pumped Storage Project by M/s Greenko RJ02… — cleared for impact study, 11.8 km away
More from Public Health Engineering Department in Chittaurgarh
- Laying of Pipe Line Water Supply Project of 648 villages in Block Begun… — decision issued
3 Public Health Engineering Department, Rajasthan projects in Chittaurgarh
All 52 Public Health Engineering Department, Rajasthan projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.