What is this project?
Common Generation Pooling Station of Avaada Energy Private Limited Solar Power Projects – Fatehgarh IV (ISTS) Pooling Station (Section-II) 220 kV S/c line on D/c towers is a proposed power project in Langon Ki Dhani, Sheo, Barmer, Rajasthan. The site covers 206.1 acres.
Who is building it?
The applicant is Avaada Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Langon Ki Dhani, Sheo, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹100 crore; a site of 206.1 acres and 560 m² of forest land.
When was it filed?
The application was filed on 5 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 5 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Energy Private Limited |
| Land area | 206.1 acres (83.4 ha) |
| Forest land | 560 m² |
| Project cost | ₹100 crore |
| Village / locality | Langon Ki Dhani |
| Taluk / tehsil | Sheo |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36023 |
In context
24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 206.1 acres, this one is smaller than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Langon Ki Dhani, Sheo, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Approach Road for Proposed Hindustan Petroleum Corporation Ltd. Retail Outlet… — forest land use approved, 1.3 km away
- Approach Access for Proposed Bharat Petroleum Corporation Limited Retail… — forest land use approved, 2.3 km away
- "Construction of LILO of 220 kV S/C Transmission Line Akal-Barmer to Proposed… — forest land use approved, 5.3 km away
- Proposed Mining Project Masonary Stone ,Plot No. 196, Area 2.0Hect. Near… — cleared for impact study, 5.7 km away
- Proposed Project Masonary Stone Mine Amalgamation Plot No. - 191, 192, 193… — cleared for impact study, 5.7 km away
- Proposed Hatisingh Ka Gaon Silica Sand Mine Area Near Village-Hatisingh Ka… — environmental approval granted, 5.8 km away
- Proposed Hatisingh Ka Gaon Silica Sand Mine Area Near Village-Hatisingh Ka… — cleared for impact study, 5.8 km away
- Proposed Masonry Stone Mining Project; Plot. No.- 197, Area: 2.50 Hect. Near… — environmental approval granted, 5.8 km away
All 3 Avaada Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.