Quick answers
What is this project?
Construction and Installation of Bungee Jumping at Harsh Parvat is a lapsed project in Antri, Dhod, Sikar, Rajasthan. The site covers 2,827.8 acres.
Who is building it?
The applicant is Sr Geeta Private Limited.
Has it been approved?
No. The application was lapsed on 6 Nov 2026, so it is no longer under consideration.
Where is it?
In Antri, Dhod, Sikar, Rajasthan.
How big is it?
It has a stated cost of ₹4 crore; a site of 2,827.8 acres and 1,680 m² of forest land.
When was it filed?
The application was filed on 1 May 2026.
Project details
| Official title | Construction and Installation of Bungee Jumping at Harsh Parvat in Sikar district, Rajasthan |
|---|---|
| Status | Lapsed |
| Status since | 6 Nov 2026 |
| Application filed | 1 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Sr Geeta Private Limited |
| Land area | 2,827.8 acres (1,144.4 ha) |
| Forest land | 1,680 m² |
| Project cost | ₹4 crore |
| Village / locality | Antri |
| Taluk / tehsil | Dhod |
| District | Sikar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36122 |
In context
10 applications in Sikar since January 2022 are in the same category (Other): 1 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Antri, Dhod, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Joint Swing (Giant Swing) Adventure Tourism Project at Harsh Parvat, Sikar,… — lapsed, 0 m away
- Construction and Establishment of Zip Line at Harsh Parvat — forest land use approved, 0 m away
- "Construction and Establishment of Zip Line at Harsh Parvat — lapsed, 0 m away
- Elevation 3100 Dadhich — lapsed, 400 m away
- "Development of Glass Skywalk (Elevated Transparent Viewing Platform) at Harsh… — lapsed, 550 m away
- Proposed Forest Land for Diversion for "Construction of Shree Harsh Nath… — lapsed, 2.3 km away
- " Govt. Upper Primary School, Bhoya, Tehsil- sikar gramin ,distt-sikar (Raj.)" — lapsed, 3.4 km away
- Pramod Sharma — lapsed, 3.9 km away
More from Sr Geeta Private Limited in Sikar
- Joint Swing (Giant Swing) Adventure Tourism Project at Harsh Parvat, Sikar,… — lapsed
- "Development of Glass Skywalk (Elevated Transparent Viewing Platform) at Harsh… — lapsed
- Construction and Establishment of Zip Line at Harsh Parvat — forest land use approved
- "Construction and Establishment of Zip Line at Harsh Parvat — lapsed
All 5 Sr Geeta projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.