Work of Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance for 25 Year From Cod of Grid Connected Soler Power Plants Through Resco Mode, Its Associated 11 KV Line to Connect the Plant With Various 33/11 KV Sub-Stations and Remote Monitoring System of Solar Power Plants

Work of Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance for 25 Year From Cod of Grid Connected Soler Power Plants Through Resco Mode, Its Associated 11 KV Line to Connect the Plant With Various 33/11 KV Sub-Stations and Remote Monitoring System of Solar Power Plants is an approved power project in Biharipura, Chittaurgarh, Rajasthan. The site covers 21.2 acres. Its stated project cost is ₹8 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 5 Aug 2026).

See it on the live map All projects in Chittaurgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Work of Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance for 25 Year From Cod of Grid Connected Soler Power Plants Through Resco Mode, Its Associated 11 KV Line to Connect the Plant With Various 33/11 KV Sub-Stations and Remote Monitoring System of Solar Power Plants is an approved power project in Biharipura, Chittaurgarh, Rajasthan. The site covers 21.2 acres.

Who is building it?

The applicant is J.M.K. Green Energy Private Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 5 Aug 2026), as of 27 Nov 2026.

Where is it?

In Biharipura, Chittaurgarh, Rajasthan.

How big is it?

It has a stated cost of ₹8 crore; a site of 21.2 acres and 1.1 acres (0.5 ha) of forest land.

When was it filed?

The application was filed on 26 Nov 2025.

Project details

Official titleWork of Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance for 25 Year From Cod of Grid Connected Soler Power Plants Through Resco Mode, Its Associated 11 KV Line to Connect the Plant With Various 33/11 KV Sub-Stations and Remote Monitoring System of Solar Power Plants Under Pm-Kusum Scheme - Componrnt a Under Tn-Dsm-15.
StatusForest land use approved
Status since5 Aug 2026
Application filed26 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantJ.M.K. Green Energy Private Limited
Land area21.2 acres (8.6 ha)
Forest land1.1 acres (0.5 ha)
Project cost₹8 crore
Village / localityBiharipura
Taluk / tehsilChittaurgarh
DistrictChittaurgarh
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-36358

In context

12 applications in Chittaurgarh since January 2022 are in the same category (Power): 6 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Biharipura, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.