Quick answers
What is Mobile Tower installation by BSNL?
Mobile Tower installation by BSNL is a lapsed telecom project in Dungar Patti, Bamanwas, Sawai Madhopur, Rajasthan. The site covers 0.5 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 17 Jul 2023, so it is no longer under consideration.
Where is it?
In Dungar Patti, Bamanwas, Sawai Madhopur, Rajasthan.
How big is it?
It has a stated cost of ₹91 lakh; a site of 0.5 acres and 200 m² of forest land.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Official title | Mobile Tower installation by BSNL in panchayat Village –Dhola danta , Tehsil-Nadoti District – Karauli in the State of Rajasthan |
|---|---|
| Status | Lapsed |
| Status since | 17 Jul 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 2,000 m² |
| Forest land | 200 m² |
| Project cost | ₹91 lakh |
| Village / locality | Dungar Patti |
| Taluk / tehsil | Bamanwas |
| District | Sawai Madhopur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36373 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dungar Patti, Bamanwas, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mobile Tower Installation Under 4g Saturation Project by Bsnl — lapsed, 2.6 km away
- Drinking Water Projects for The Construction of Feeder from Isarda To Khura… — under wildlife review, 18.8 km away
- Drinking Water Projects for The Construction of Feeder from Isarda To Khura… — under forest review, 18.8 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Sawai Madhopur of… — lapsed, 38.3 km away
- Reappraisal of DEIAA EC to SEIAA for Masonry Stone (Minor Mineral) Mining… — environmental approval granted, 38.5 km away
- Smt. Rampyari W/o Late Shri Kedar Mali [This is a Fresh proposal for "Masonry… — lapsed, 39.9 km away
- Existing Masonry Stone Mining Project (M.L. No.- 73/2010 & Area- 1.0 ha.) Near… — environmental approval granted, 39.9 km away
- Existing (Non-Opretional) Masonry Stone Mining Project, M.L No-73/2010, Area… — lapsed, 39.9 km away
More from Mahesh Nair in Sawai Madhopur
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.