What is Developing? Open the mapMap

LapsedRoads & highways · Sikar, Rajasthan

Diversion of forest land area 39.82 hectares (Conservation Reserve Forest 18.18 hectare And Protected Forest 21.64 hectare) for Widening & Upgradation of existing 2-L+P.S Carriageway to 4-L+P.S Carriageway with Flexible Pavement of National Highway (NH-11/52) in the state of Rajasthan. From Km 0.000 to Km 237.560 Total length out of which for 38.300 km applied. Design Ch. 0.900 to Ch. 19.400 (Sikar Bypass) & Ch. 37.300 to Ch. 57.100 (Laxmangarh-Fatehpur)

Diversion of forest land area 39.82 hectares (Conservation Reserve Forest 18.18 hectare And Protected Forest 21.64 hectare) for Widening & Upgradation of existing 2-L+P.S Carriageway to 4-L+P.S Carriageway with Flexible Pavement of National Highway (NH-11/52) in the state of Rajasthan. From Km 0.000 to Km 237.560 Total length out of which for 38.300 km applied. Design Ch. 0.900 to Ch. 19.400 (Sikar Bypass) & Ch. 37.300 to Ch. 57.100 (Laxmangarh-Fatehpur) is a lapsed road project in Purabagriyon Ki Dhani, Dhod, Sikar, Rajasthan. The site covers 360.1 acres. Its stated project cost is ₹350 crore. As of 27 Nov 2026, its status is “Lapsed” (since 20 Feb 2025).

See it on the live map All projects in Sikar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land area 39.82 hectares (Conservation Reserve Forest 18.18 hectare And Protected Forest 21.64 hectare) for Widening & Upgradation of existing 2-L+P.S Carriageway to 4-L+P.S Carriageway with Flexible Pavement of National Highway (NH-11/52) in the state of Rajasthan. From Km 0.000 to Km 237.560 Total length out of which for 38.300 km applied. Design Ch. 0.900 to Ch. 19.400 (Sikar Bypass) & Ch. 37.300 to Ch. 57.100 (Laxmangarh-Fatehpur) is a lapsed road project in Purabagriyon Ki Dhani, Dhod, Sikar, Rajasthan. The site covers 360.1 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

No. The application was lapsed on 20 Feb 2025, so it is no longer under consideration.

Where is it?

In Purabagriyon Ki Dhani, Dhod, Sikar, Rajasthan.

How big is it?

It has a stated cost of ₹350 crore; a site of 360.1 acres and 95.7 acres (38.7 ha) of forest land.

When was it filed?

The application was filed on 14 Nov 2024.

Project details

Official titleProposal for diversion of forest land area 39.82 hectares (Conservation Reserve Forest 18.18 hectare And Protected Forest 21.64 hectare) for Widening & Upgradation of existing 2-L+P.S Carriageway to 4-L+P.S Carriageway with Flexible Pavement of National Highway (NH-11/52) in the state of Rajasthan. From Km 0.000 to Km 237.560 Total length out of which for 38.300 km applied. Design Ch. 0.900 to Ch. 19.400 (Sikar Bypass) & Ch. 37.300 to Ch. 57.100 (Laxmangarh-Fatehpur).
StatusLapsed
Status since20 Feb 2025
Application filed14 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area360.1 acres (145.7 ha)
Forest land95.7 acres (38.7 ha)
Project cost₹350 crore
Village / localityPurabagriyon Ki Dhani
Taluk / tehsilDhod
DistrictSikar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-36660

In context

45 applications in Sikar since January 2022 are in the same category (Roads & highways): 6 approved, 13 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 360.1 acres, this one is smaller than 67% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Purabagriyon Ki Dhani, Dhod, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Sikar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.